Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

383 unique locations (4545 components) - Page 1 of 16

YEWTREE HOUSE, CROXALL ROAD, ALREWAS, BURTON ON TRENT, STAFFORDSHIRE, DE13 7BA (7 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Yeomans Way, Bournemouth, BH8 0BQ (1 component)

DSR component offering load turn down at a retail store

Inactive • 2021-22 (T-4)
Wrexham Industrial Estate Wrexham LL13 9UG (17 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (12 components)

In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Wolstanton Retail Park, Wolstanton, Newcastle, ST5 0AP (12 components)
• DSR Component providing load turn down at a retail store
• Import/Export metering with diesel generation at a retail store
Inactive • 2021-22 (T-4), 2020-21 (T-1) ...
0.87 MW
Winkhurst Green, Ide Hill, Sevenoaks, TN14 6LD (13 components)

3 x 1.6MW POSGU (standby generation)

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Windmill Hill Business Park, Swindon, SN5 6QR (8 components)
• Load curtailment and standby generation
• Load reduction via standby generation taking onsite load
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
WILSTHORPE WS, WILSTHORPE, PE9 4PD (11 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Active • 2025-26 (T-4), 2023-24 (T-1) ...
16.16 MW
Willows Drayton Manor Farm Alcester Road Stratford-Upon-Avon CV37 9TQ (8 components)
• 1 MW of demand reduction
• 1MW of demand reduction
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
WHITEFIELD ROAD, BREDBURY, STOCKPORT, CHESHIRE, SK6 2QP (8 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
21.54 MW
Western Harbour, Leith Docks, Edinburgh, Lothian,EH6 6PQ (5 components)

Flour & semolina milling business

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
West Carr Lane, Hull HU7 0BS, UK (9 components)

Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Weighbridge Road, Shotton, Deeside, CH5 2LL (26 components)

Paper mill industrial site

Inactive • 2023-24 (T-1), 2023-24 (T-4) ...
48.00 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
44.21 MW
Water Treatment Works, Hawks Hill, Fetcham, Leatherhead, Surrey KT22 9DA (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
Water Treatment Works, Godstone Road, Kenley, Surrey, CR8 5AE (1 component)

Mixture of load reduction on flexible electricity consuming processes including refrigeration air-conditioning pumping and lighting and standby generation.

Inactive • 2021-22 (T-4)
WANSFORD INTAKE, WANDSFORD, PE8 6LG (5 components)

The CMU Component reduces import demand by turning off equipment and other non-essential loads.

Inactive • 2022-23 (T-1), 2021-22 (T-4)
Veolia, Trent Lane Industrial Estate, Trent Lane, Castle Donington, Derby, DE74 2PY (14 components)

Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.07 MW
Veolia, Bridges Rd, Ellesmere Port, Cheshire, CH65 4EQ (12 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Unproven DSR yet to be procured (62 components)

Unproven DSR yet to be procured

Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
30.00 MW
Unit A, The Loddon Centre, Basingstoke, Hampshire, RG24 8QW (5 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 6, Lime Kilns Business Park, Hinckley, Leicestershire, LE10 3EL (9 components)

Gas generators

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 4 Baird Way, Thetford IP24 1JA, United Kingdom (7 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 25 locations