Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4 unique locations (178 components)

Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (2 components)
• Component has yet to be procured.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Northfleet Mill, Crete Hall Road, Gravesend, DA11 9AD (18 components)
• 13-turbine wind farm located in Lanark, Scotland with the installed capacity of 45.000MW
• Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW
• Paper Mill carrying out DSR using load turn-down.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
33.39 MW
Component has yet to be procured. (154 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• Component has yet to be procured.
• N/A
Active • 2025-26 (T-4), 2024-25 (T-4) ...
252.48 MW
Axgro Foods Park Farm Rd, Scunthorpe, DN15 8QP, United Kingdom (4 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Loading map...
Showing 4 locations