Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

6 unique locations (45 components)

THE SIDINGS STATION APPROACH ROAD HEATHFIELD NEWTON ABBOT TQ12 6RG (5 components)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
• Unproven DSR Component
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Substation at Saltend Lane Preston East Riding of Yorkshire HU12 8EY (6 components)
• N/A
• The CMU Component reduces import demand by turning off equipment and other non-essential loads.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (2 components)
• Component has yet to be procured.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Merseyside Waste Disposal Unit, The Old Coal Depot, Wallesey Bridge Road, Bidston Moss, Birkenhead, CH41 1EB (16 components)
• Generator at the Hospital
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
LAND AT HEATH BUSINESS PARK GRANGE WAY COLCHESTER ESSEX CO2 8GU (10 components)
• CMU consisting of a gas reciprocating engine and alternator
• CMU consisting of a gas reciprocating engine and an alternator
• Load reduction upon instruction
Inactive • 2023-24 (T-4), 2023-24 (T-1) ...
4.83 MW
Former National Cars, Stopgate Lane, Simonswood, Liverpool L33 4YA (6 components)
• Load Response - Automated Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms
• Palm Paper Limited operates a large paper making site in King's Lynn, Norfolk. The onsite industrial process is an energy intensive paper recycling and manufacturing plant. Palm Paper plans to shut down predetermined parts of this recycling process in response to system stress events and thereby deliver the stated load reduction capacity.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Inactive • 2023-24 (T-4), 2021-22 (T-4) ...
Loading map...
Showing 6 locations