3 unique locations (31 components)

Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (11 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.65 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW