Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

15 unique locations (240 components)

WINTERS WAY HOLMER GREEN HIGH WYCOMBE BUCKINGHAMSHIRE HP15 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTER'S PLACE EASTLEIGH HAMPSHIRE SO50 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTERS FIELD TAUNTON SOMERSET TA1 (11 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
15.18 MW
winter lane west hanney wantage OX12 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
17.35 MW
WINTER CRESCENT LYDNEY GL15 (10 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
13.01 MW
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Component has yet to be procured.
• The site comprises of gas reciprocating unit(s)
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
land adjacent to the FIFE GRID SERVICES FACILITY 275KV SUBSTATION, adjacent to the A876 at Kincardine, Fife, FK10 4BL. (31 components)
• 5.7MW Combined heat and Power Plant Plant at the Heat Station is made up of 2 generators totalling 6.7MW however the generator sizes have been inserted pro rata to achieve the overall CMU capacity of 6.038MW as per the 3 highest export peaks
• Lithium ion battery storage plant
• SolarPV generating station
Active • 2028-29 (T-4), 2026-27 (T-4) ...
134.94 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
214.92 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (14 components)
• EV charging at residential premises
• Gas fired generating units
• Gas reciprocating engines
Active • 2027-28 (T-4), 2025-26 (T-4) ...
4.94 MW
Asda Witham Highfields Road, Benfield Way Lakes Road Braintree CM7 3YS (10 components)
• CHP unit
• Load reduction.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
5.71 MW
Asda Brierley Hill, Pedmore Road Brierley Hill West Midlands DY5 1LJ (9 components)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
• Load reduction
• N/A
Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (11 components)
• 10 gas reciprocating engines used for power generation, with associated infrastructure.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
6.65 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (4 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
• Gas fired reciprocating engine(s)
Active • 2028-29 (T-4), 2026-27 (T-4) ...
978.65 MW
Loading map...
Showing 15 locations