Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

4360 unique locations (79104 components) - Page 1 of 175

ZUBRON GROVE MILTON KEYNES BUCKINGHAMSHIRE MK8 (8 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
18.00 MW
ZE2 (14 components)

Domestic EV charger

Active • 2025-26 (T-4), 2024-25 (T-1) ...
42.25 MW
ZE1 (2 components)

Domestic EV charger

Active • 2024-25 (T-1), 2024-25 (T-4)
7.04 MW
YWA CENTRAL DIVISION ECCUP WTW, ECCUP MOOR ROAD, LEEDS, WEST YORKSHIRE, LS16 8AW (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER SERVICES LIMITED, SOUTH MILFORD/WPS, COMMON LANE, SOUTH MILFORD, LEEDS, LS25 5BZ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER PLC, SEWAGE TREATMENT WORKS, ALDWARKE, ROTHERHAM, SOUTH YORKSHIRE, S65 3SR (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
YORKSHIRE WATER PLC, KNOSTROP TREATMENT WORKS, KNOWSTHORPE LANE, LEEDS, LS9 0PJ (2 components)

On site reduction in consumption

Active • 2025-26 (T-1), 2024-25 (T-1)
YORKSHIRE WATER PLC, CHELLOW HEIGHTS W T W, HAWORTH ROAD, BRADFORD, BD9 6NX (2 components)

On site reduction in consumption

Active • 2024-25 (T-1)
14.00 MW
YORKSHIRE WATER PLC, CALDER VALE ROAD, WAKEFIELD, WF1 5PJ (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
YORKSHIRE WATER PLC, BLACKBURN MEADOWS, ALSING ROAD, WINCOBANK, SHEFFIELD, S9 1HF (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
YORKSHIRE WATER PLC, ASHGROVE ROAD, BRADLEY, HUDDERSFIELD, HD2 1FE (1 component)

On site reduction in consumption

Active • 2024-25 (T-1)
Yorkshire Water, Huddersfield HD2 1GQ (3 components)

Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.

Active • 2027-28 (T-4), 2024-25 (T-1)
14.00 MW
14.00 MW
YORK ROAD NORTH DUFFIELD SELBY YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
York Road Cliffe Selby YO8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
170.17 MW
YO8 (58 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
171.01 MW
YO7 (27 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
110.08 MW
YO62 (17 components)
• Domestic EV
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
48.27 MW
YO61 (31 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
64.27 MW
YO60 (11 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2024-25 (T-1) ...
36.45 MW
YO51 (18 components)
• Domestic EV charge point
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
84.51 MW
YO43 (15 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
94.19 MW
Loading map...
Showing 25 locations