Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Buy Me A Coffee Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

16 unique locations (471 components)

Woodlands Centre, Composting Facility, Whitesmith, Lewes, East Sussex, BN8 6JD (15 components)
• Heysham 2 Power Station CMU 7: [HY2720] T_HEYM27 + (50% x T_HEYM2-D)
• In- vessel composting facility. Heavy plant used to produce animal feed and garden compost that can be turned down for DSR.
• Materials recycling facility comprising several DSR loads: conveyor belts, shredders and cranes.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Thanet Earth Plot 2, 2 Barrow Man Road Birchington Kent CT7 0AX (16 components)
• CHP engine in horticultural environment with no auxilliary load
• existing on site CHP
• existing onsite CHP
Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.46 MW
Llanwern Steelworks Newport Gwent NP19 4QZ United Kingdom (30 components)
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1 and then cloned to TS18_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1 and TS20_1
• Industrial Steelmaking / Manufacturing Site. The DSR capacity (MW) is the proven DSR capacity. The DSR Test Certificate applies to TS16_1, cloned to TS17_1, TS18_1, TS19_1, TS20_1 and TS21_1 as well as TS23_1
Active • 2025-26 (T-1), 2024-25 (T-1) ...
195.61 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (16 components)
• A completed power plant, with associated civil works, switchgear and electrical connection.
• Heysham 2 Power Station CMU 8: [HY2823] T_HEYM28 + (50% x T_HEYM2-D)
• Kendoon hydro power station - Unit 1, part of the Galloway hydroelectric scheme The registered capacity of the Kendoon power station is 26.25MVA or 24MW at 0.915PF. Each of the 2 generating unit components are identical, i.e. 12MW each for unit 1 and unit 2.
Active • 2027-28 (T-4), 2025-26 (T-4) ...
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (18 components)
• Dungeness B Power Station CMU 22: [DN2222] T_DNGB22 + (50% x T_DNGB-D)
• Load Response ? Automated. Dispatch via Proprietary Panel encompassing industrial computer, smart meters, smart I/O &/or serial comms.
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
765.00 MW
EDF Energy, Sizewell B power station, Nr Leiston, Suffolk, IP16 4UR (39 components)
• Sizewell B Power Station CMU 1: [SZ1-24] T_SIZB-1 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-23] T_SIZB-2 + (50% x T_SIZB-D)
• Sizewell B Power Station CMU 2: [SZ2-24] T_SIZB-2 + (50% x T_SIZB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4640.16 MW
EDF Energy, Hunterston B power station, West Kilbride, Ayrshire, KA23 9QX (40 components)
• Existing CCGT Unit
• Hunterston B Power Station CMU 7: [HU7-21] T_HUNB-7 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
• Hunterston B Power Station CMU 8: [HU8-21] T_HUNB-8 + (50% x T_HUNB-D) + (50% x E_HUNB-11S)
Active • 2025-26 (T-4), 2024-25 (T-4) ...
1607.21 MW
EDF Energy, Hinkley Point B power station, Nr Bridgwater, Somerset, TA5 1UD (56 components)
• Hinkley Point B Power Station CMU 7: [HP7-22] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 7: [HP7-23] T_HINB-7 + (50% x T_HINB-D)
• Hinkley Point B Power Station CMU 8: [HP8-23] T_HINB-8 + (50% x T_HINB-D)
Active • 2027-28 (T-4), 2026-27 (T-4) ...
1771.09 MW
EDF Energy, Heysham 1 power station, Morecambe, Lancashire, LA3 2XH (33 components)
• EV charge station
• Heysham 1 Power Station CMU 1: [HY1124] T_HEYM11
• Heysham 1 Power Station CMU 2: [HY1224] T_HEYM12
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2591.79 MW
EDF Energy, Hartlepool power station, Tees Road, Hartlepool, TS25 2BZ (57 components)
• Hartlepool Power Station CMU 2: [HR2-23] T_HRTL-2
• Hartlepool Power Station CMU 2: [HR2-24] T_HRTL-2
• Hartlepool Power Station CMU 1: [HR1-24] T_HRTL-1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5859.76 MW
EDF Energy, Dungeness B power station, Romney Marsh, Kent, TN29 9PX (41 components)
• Dungeness B Power Station CMU 21: [DN2124] T_DNGB21 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2223] T_DNGB22 + (50% x T_DNGB-D)
• Dungeness B Power Station CMU 22: [DN2224] T_DNGB22 + (50% x T_DNGB-D)
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1489.08 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (57 components)
• CMU component consisting of multiple battery cells for electricity storage @ 400V and the supply of electricity to the 400V network
• The CMU component is a combined cycle gas turbine
• one CHP (1.9MW rating) in a horticulatural environment with no aux load
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3488.59 MW
Asda Skelton, Cleveland Potash Limited, Boulby Mine, Saltburn-by-the-Sea TS13 4UZ (3 components)
• Dungeness B Power Station CMU 21: [DN2123] T_DNGB21 + (50% x T_DNGB-D)
• Load curtailment
• Load drop capability at mine shaft site located at Boulby Mine, Saltburn-by-the-Sea TS13 4UZ
Active • 2027-28 (T-4), 2023-24 (T-4) ...
2.58 MW
Asda Sheffield Drakehouse, Joan Ln, Bamford, Hope Valley S33 0AW (7 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• Load reduction on site supported by non-exporting standby generation.
• Sizewell B Power Station CMU 1: [SZ1-20] T_SIZB-1 + (50% x T_SIZB-D)
Active • 2027-28 (T-4), 2024-25 (T-4) ...
7.43 MW
Asda Boston, Sleaford Road PE21 8EQ (8 components)
• Heysham 1 Power Station CMU 1: [HY1123] T_HEYM11
• Load curtailment from refridgeration
• Load drop
Active • 2028-29 (T-4), 2027-28 (T-4) ...
31.90 MW
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (35 components)
• EV charging at residential premises
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
15.10 MW
Loading map...
Showing 16 locations