Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

DSR (Demand Side Response)

677 unique locations (9526 components) - Page 1 of 28

YO43 (15 components)
• Domestic EV charge point
• Domestic EV charger
Active • 2025-26 (T-1), 2025-26 (T-4) ...
94.19 MW
Wrexham Industrial Estate Wrexham LL13 9UG (18 components)

Load reduction

Active • 2025-26 (T-4), 2022-23 (T-3) ...
1.02 MW
WIKE RIDGE MEWS, LEEDS, LS17 (9 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2023-24 (T-1) ...
14.02 MW
View, Church Road, SHEDFIELD, SOUTHAMPTON, SO32 (4 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
0.11 MW
UNIT R2 ASHFORD AIRPORT, COLD STORE, LYMPNE, HYTHE, KENT, CT21 4LR (2 components)

Load drop at large Industrial cold storage

Inactive • 2020-21 (T-4)
1.02 MW
Tuscany Park Express Way WF10 5UA (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Tuesley Farm, Tuesley Lane, Godalming, Surrey GU7 1UG (9 components)
• Water Source Heat Pumps at 1748KW each (x2)
• Water source heat pumps at 1748kW each
Active • 2028-29 (T-4), 2025-26 (T-1) ...
76.97 MW
Truro Pydar St - West Cornwall TR1 2BD (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
TN28 (13 components)
• Domestic EV charger
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
28.21 MW
THE WINTLES, BISHOPS CASTLE, SHROPSHIRE, SY9 (10 components)

EV charging on residential premises

Active • 2026-27 (T-4), 2025-26 (T-4) ...
13.71 MW
Telford Forge Rp - Shropshire and Cheshire TF3 4AG (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
Sutton Courtenay Rd, Abingdon, OX14 4SE (4 components)

Load reduction on site supported by non-exporting standby generation.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
SUPPLY TO R1, UNIT R1-R8, LYMPNE INDUSTRIAL ESTATE, LYMPNE, HYTHE, CT21 4LR (2 components)

Load drop at large Industrial cold storage

Inactive • 2020-21 (T-4)
1.02 MW
STW Water Netheridge, Hempstead Lane, Hempstead, Gloucester, GL2 5LF (1 component)

Permitted Onsite Generator located at Waste Water Treatment works

Active • 2025-26 (T-4)
14.00 MW
Stratford U Avon Maybird - Chelthenham and Worcester CV37 0HZ (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
St Andrews Road, Kings Weston Lane BS11 9FG (5 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
Staithes Road, Washington NE38 8NW (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
SIDS FIELD CASTLE CARROCK BRAMPTON CA8 (12 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.42 MW
Sheeplands Farm, Twyford, Wargrave, Reading RG10 8DJ (7 components)

Water source heat pumps at 1748kW each

Active • 2028-29 (T-4), 2025-26 (T-1) ...
62.91 MW
Sheeplands Farm, Twyford Road, Wargrave, Reading, RG10 8DJ (2 components)

Water source Heat Pumps at 1748KW each - located at Horticultural site

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Scunthorpe Cold Store, Cupola Way, Scunthorpe DN15 9YJ (13 components)
• Load drop
• Load reduction on flexible electricity consuming processes
Active • 2025-26 (T-4), 2024-25 (T-4) ...
4.73 MW
Saltend Lane, HULL, HU12 8PP (27 components)
• Load reduction
• Load reduction on site
Active • 2028-29 (T-4), 2025-26 (T-4) ...
14.86 MW
Rochdale Riverside RP - North Manchester OL16 1BE (1 component)

Commercial sites

Active • 2024-25 (T-1)
5.03 MW
RH2 (50 components)
• Domestic EV charger
• Domestic battery, charged by on site PV generation and grid supply. Charge and discharge managed via remotely controlled on-site control unit.
• Domestic demand turn down
Active • 2027-28 (T-4), 2025-26 (T-1) ...
185.54 MW
Redhouse Interchange, Adwick-Le-Street, DN6 7FB (4 components)
• Load reduction from refrigeration
• Load reduction on site supported by non-exporting standby generation.
Active • 2024-25 (T-1), 2022-23 (T-4) ...
5.33 MW
Loading map...
Showing 25 locations