DSR (Demand Side Response)

7 unique locations (66 components)

Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, ST5 9JA (8 components)
• Medway CCGT
• The CMU Component is made of brand new gas-fired engines.
• The CMU Component is made up of gas-fired engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
London School of Hygiene & Tropical Medicine Keppel St, Bloomsbury, London WC1E 7HT (6 components)
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (4 components)
• Grain B CCGT Unit 7 CHP element is via supply of heat to Grain LNG regasification facility
• Load reduction on site supported by non-exporting standby generation.
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.
Inactive • 2022-23 (T-4), 2022-23 (T-3)
Land to north of SPEN Drumcross GSP, Byers Brae, Bathgate EH54 8TB. See map. (12 components)
• Killingholme Module 2 converted to open cycle operation
• Load reduction
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-4), 2022-23 (T-3) ...
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (3 components)
• DSR Component providing load turn down at a data centre
• OCGT from Grain U4. Fuel is Gas Oil as specified in BS 2869 Class A2
• The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed to generate from landfill gas, but will be converted to natural gas and then recommissioned, ahead of the delivery year. The three components of the CMU (referenced VIR074, VIR079 and VIR080) are Cummins QSV91 units, built in 2008 and rated at 1,750kW. Each engine generates at 415V, which is then stepped up to 11kV and then to 33kV for export.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Gowanbank TWP Gowanbank Armadale Bathgate West Lothian EH48 5AP (3 components)
• Gowanbank Water Pumping Station
• Ratcliffe Unit 1 coal-fired unit
Inactive • 2022-23 (T-4), 2018-19 (T-1)
DS Smith Paper Limited, Kemsley Paper Mill, Sittingbourne, Kent, ME10 2TD (30 components)
• A 49MW New Build Battery Storage Site.
• A gas turbine generating unit, part of a CHP which supplies heat & power to a paper mill
• A steam turbine generating unit, part of a CHP which supplies heat & power to a paper mill
Inactive • 2023-24 (T-1), 2022-23 (T-4) ...
214.92 MW
Loading map...
Showing 7 locations