Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Energy from Waste

12 unique locations (91 components)

Wolverhampton EfW Crown Street West Midlands WV1 1QB (7 components)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 7.3MW. We have added covering letters on the following, change in registered address for WWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
• 2 stream municipal waste incinerator. Total Installed capacity 8.7MW, DNC 8.35MW
Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Stoke EfW plant Campbell Road Sideway Stoke on Trent St4 4DX (11 components)
• 2 stream municipal waste incinerator
• 2 stream municipal waste incinerator generating electricity through one turbine generator. Electricity is used on site with the excess being sold onto the grid. We have added covering letters on the following, change in registered address for HWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2019-20 (T-1), 2021-22 (T-4) ...
Plot 8 Protos Grinsome Road Elton CH2 4LF (1 component)

An Energy from Waste facility located in Cheshire. The Facility will utilise conventional mass-burn technology which is the most proven Energy from Waste technology currently available. The process will consist …

Inactive • 2022-23 (T-4)
Marchwood ERF, Oceanic Way, Marchwood Industrial Park, Normandy Way, Marchwood, Hampshire SO40 4BD (6 components)

Municipal waste incineration plant located in Marchwood Hampshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
10.37 MW
Lister Road Dudley West Midlands DY2 8JT (9 components)
• 2 stream Municipal waste incinerator: Total installed capacity 7.3MW, DNC 6.2MW
• 2 stream Municipal waste incinerator: Total installed capacity 7.4MW, DNC 6.3MW. We have added covering letters on the following, change in registered address for DWS as shown in the connection agreement, confirmation of the location of the CMU and confirmation on the new name for Midland Electricity (named party on the Connection Agreement)
Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Lakeside EfW, Lakeside Road, Colnbrook, SL3 0FE (16 components)

Energy from Waste Facility

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Javelin Park Energy From Waste Plant, Javelin Park Bath Road Near Haresfield, Gloucestershire (12 components)

Energy from Waste facility for the combustion of waste and the generation of energy, comprising the main EfW facility, a Bottom Ash processing facility and Education/Visitor Centre, together with Associated/Ancillary …

Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
Four Ashes ERF, Enterprise Drive, Wolverhampton, WV10 7DF (4 components)

Municipal waste incineration plant located in Wolverhampton, Staffordshire. It is based on boilers supplying steam to a turbine-generator.

Inactive • 2021-22 (T-1)
Dunbar ERF, Oxwell Mains, Dunbar, East Lothian, EH42 1SW (6 components)
• Dunbar ERF, Energy from Waste
• Twin stream Energy from Waste plant with a connection capacity of 36MW and an expected export of 34MW. Located in Oxwell mains near Dunbar.
Inactive • 2019-20 (T-1), 2020-21 (T-4)
Coatbridge, ML5 4UG, Scotland (4 components)

Energy from Waste facility

Inactive • 2021-22 (T-4), 2022-23 (T-4) ...
Beddington ERF, 105 Beddington Lane, Croydon, CR0 4TE (4 components)

Twin stream Energy from Waste plant with a maximum connection capacity of 27MW and an expected export of at least 24MW, located in Beddington Lane, Croydon.

Inactive • 2019-20 (T-1)
Avonmouth ERF, Severn Road, Chittering, Bristol, BS11 0YU (11 components)
• Twin stream Energy from Waste plant with a connection capacity of 37.216MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and a minimum export of 33.7MW (at reference conditions). Located in the Chittering Industrial Estate, Avonmouth.
• Twin stream Energy from Waste plant with a connection capacity of 38MW, a construction export guarantee of 34.1MW and an expected export of 36MW. Located in the Chittering Industrial Estate in Avonmouth.
Inactive • 2021-22 (T-1), 2022-23 (T-1) ...
32.61 MW
Loading map...
Showing 12 locations