Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Gas

14 unique locations (357 components)

Whitewall Road, Rochester, Kent, ME2 4DZ (5 components)

A series of gas generators on an existing site.

Active • 2024-25 (T-1), 2023-24 (T-1)
94.85 MW
ST. JOHNS COURT BRECON POWYS LD3 (13 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
158.22 MW
Staverton, Trowbridge, Wiltshire, BA14 6PH (51 components)

Turbomach M50 Natural Gas fired CHP unit

Active • 2024-25 (T-4), 2023-24 (T-1) ...
26.77 MW
18.28 MW
139.23 MW
QUEENS AVENUE, MARKET DEEPING, PETERBOROUGH, PE6 (8 components)

EV charging on residential premises

Inactive • 2023-24 (T-1), 2022-23 (T-1)
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
253.83 MW
Huntsman Drive, Seal Sands, TS2 1TT (6 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
191.90 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station CMU 2 WA2-19 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2450.85 MW
Drakemyre, Dalry KA24 5JJ (53 components)
• Gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• Large engine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
• One 22.9MVA gas turbine in an industrial station environment, exporting excess energy to distribution network. Primary fuel type = Natural Gas
Active • 2028-29 (T-4), 2026-27 (T-4) ...
97.49 MW
DENMARK CLOSE CORBY NORTHAMPTONSHIRE NN18 (15 components)

EV charging at residential premises

Active • 2027-28 (T-4), 2026-27 (T-4) ...
4.85 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (15 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
291.40 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (18 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
186.17 MW
Loading map...
Showing 14 locations