OCGT and Reciprocating Engines (Fuel Type - Gas)

53 unique locations (580 components) - Page 1 of 3

Active MW: 20139.41 MW
Inactive MW: 10208.38 MW
1A Elms Farm Industrial Estate, Edison Road, Bedford, Bedfordshire, MK41 0HU (5 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2021-22 (T-1) ...
14.22 MW
4 Finway Road, Hemel Hempstead, HP2 7PT (6 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2021-22 (T-4) ...
14.23 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (16 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Aberdare Power Station Aberdare Power Station +9 more CF44
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.43 MW
Arlesey Landfill Site Mill Lane Arlesey Bedfordshire SG15 6RF (4 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
2.13 MW
Arlesey Landfill Site, Mill Lane, Arlesey, Bedfordshire, SG15 6RF (14 components) Geocoding Needed
• Gas reciprocating engines
• The system comprises of two gas reciprocating engines provided an exported output of around 2MW.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
22.55 MW
Aveley Landfill Site Sandy Lane Aveley RM15 4XP (6 components)

Gas reciprocating engines (3)

Active • 2024-25 (T-1), 2023-24 (T-1) ...
1.85 MW
Aveley Landfill Site, Sandy Lane, Aveley, RM15 4XP (17 components) Geocoding Needed
• 4x gas reciprocating engines with a combined output of approximately 4.3MW. All associated gas delivery equipment and switchgear is included. The generating units are connected to the distribution network.
• Gas fired generating units
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
25.88 MW
Bond Avenue, Bletchley, Milton Keynes, MK1 1JJ (5 components) Geocoding Needed

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2021-22 (T-1) ...
16.97 MW
Burghfield Mini Power Plant, Cottage Lane, Pingewood, Reading, RG30 3UW (15 components) Geocoding Needed

1 x OCGT

Active • 2028-29 (T-4), 2027-28 (T-4) ...
623.88 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset., TA3 6RX (10 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
60.76 MW
Carrington Power Station, 132 Manchester Road, Carrington, Manchester, M31 4AY, United Kingdom (28 components) Geocoding Needed
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7531.31 MW
Cavendish Rd, Stevenage, SG1 2ET, UK (13 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.45 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (11 components) Geocoding Needed

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
1172.84 MW
Chase Hill Road, Killingholme, North Lincolnshire, DN40 3LU (26 components) Geocoding Needed
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4447.95 MW
Chesterfield Road, Swallownest, Sheffield, S26 4SX (2 components) Geocoding Needed
• Gas fired reciprocating engines
• New Build Generating CMU comprising of battery storage and associated plant.
Storage (Duration 2h) OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Chesterfield Chesterfield Road Not Prequalified S26
Active • 2026-27 (T-4), 2021-22 (T-4)
21.80 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (8 components) Geocoding Needed

4 x reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.80 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (15 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cowley Hill Power Station Cowley Hill Power Station +8 more WA10
Active • 2028-29 (T-4), 2027-28 (T-4) ...
72.67 MW
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 3TD (7 components) Geocoding Needed
• 2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.
• Gas reciprocating engines
Active • 2028-29 (T-4), 2027-28 (T-4) ...
20.11 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (10 components) Geocoding Needed

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
53.26 MW
Faraday Road, Plymouth, PL4 0ST (5 components) Geocoding Needed
• Gas fired reciprocating engines.
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
75.75 MW
Garden Lane, Cadeby, Doncaster, DN5 7SN (7 components) Geocoding Needed
• 1 x 2MW CAT G3520CPKG
• Gas fired generating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
33.23 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (16 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Styal Road Power Station Styal Road Power Station +8 more M22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.96 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (15 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Greengate Power Station Greengate Power Station +8 more WA9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
75.02 MW
Grimsby Power Station, Moody Lane, Grimsby, DN31 2SW (9 components) Geocoding Needed
• CMU will be formed of multiple individual gas reciprocating engine units
• Ten (10) 2MWe gas reciprocating gas engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
152.06 MW
Kings Mill Hospital, Mansfield Road, Sutton in Ashfield, NG17 4JL (5 components) Geocoding Needed
• 2 x 1.55 MW Contianerised Generating Sets.
• Gas reciprocating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2021-22 (T-4) ...
13.39 MW
Loading map...
Showing 25 locations