OCGT and Reciprocating Engines (Fuel Type - Gas)

155 unique locations (349 components) - Page 1 of 7

Active MW: 10300.49 MW
Inactive MW: 1610.30 MW
Wincham Lane, Wincham, Northwich CW9 6DE (4 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (2 components)
• 1 x jenbacher j616
• Gas reciprocating engine
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Watling Rd, Bishop Auckland DL14 9AS (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Warsop Energy Park Carter Lane, Warsop Vale, NG20 8XG (3 components)
• 1 x MWM TCG 1.35MW (2)
• Gas fired generating units
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Walton Road, Burton Upon Trent, DE15 9NG (4 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Venture Road, Fleetwood, Blackpool, FY7 8RS (1 component)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Inactive • 2018-19 (T-1)
Vacant Land Wayn-Y-Pound Industrial Estate Ebbw Vale Gwent NP23 6PL (1 component)

16 MW power plant comprising 8 x 2MW reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2018-19 (T-1)
Vacant Land, Griffiths Road, Lostock Gralam, Northwich CW9 7ZR (1 component)

20 MW power plant comprising 10 x 2MW gas reciprocating engines. The power plant will be connected to the local electricity distribution network and local gas network.

OCGT and Reciprocating Engines (Fuel Type - Gas) NORTHWICH POWER LIMITED New Build Generating CMU Northwich Power Not Prequalified CW9
Inactive • 2018-19 (T-1)
Unit J1 Aven Industrial Park, Tickhill Road, Maltby, Rotherham, S66 7QR (3 components)

Gas fired generating sets (3)

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Unit H, Lyon Road, Bletchley, Milton Keynes MK1 1EX (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit D, Kendale Rd, Scunthorpe DN16 1DT (10 components)
• New build power station comprised of multiple reciprocating engines. (2)
• Gas and/or diesel reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Unit B1-B3 Coed Cae Industrial Estate, Pontyclun, South Wales, CF72 9HG (3 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network. (2)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The Power plant is connected to the WPD distribution network and WWU gas network.
OCGT and Reciprocating Engines (Fuel Type - Gas) LARIGAN POWER LIMITED New Build Generating CMU Larigan Power Larigan Power +1 more CF72
Inactive • 2018-19 (T-1), 2017-18 (T-1) ...
Unit A, The Loddon Centre, Basingstoke RG24 8QW (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the Local distribution network and local gas network.

OCGT and Reciprocating Engines (Fuel Type - Gas) LODDON POWER LIMITED New Build Generating CMU Loddon Power Not Prequalified RG24
Inactive • 2018-19 (T-1)
Unit 6, Lime Kilns Business Park, Hinckley LE10 3EL (1 component)

16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.

OCGT and Reciprocating Engines (Fuel Type - Gas) KILN POWER LIMITED New Build Generating CMU Kiln Power Not Prequalified LE10
Inactive • 2018-19 (T-1)
Unit 3C Oak Park Industrial Estate, Portsmouth, PO6 3TJ (1 component)

Power plant comprising of 8 x 2MW gas reciprocating engines connected to the local Distribution network

Inactive • 2018-19 (T-1)
Unit 21, West End Industrial Estate, Bruntcliffe Road, Morley, Leeds LS27 0LQ (2 components)

New build power station comprised of multiple reciprocating engines. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Unit 1b, Access 63, East Common Lane, Selby, YO8 8GA (1 component)

Power plant comprising of 8 x 2MW gas reciprocating engines connected to the local distribution network.

Inactive • 2018-19 (T-1)
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW (3 components)
• NEW BUILD DIESEL GENERATION STATION
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS GENERATION STATION
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Turweston Road, Brackley NN13 7DD (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system. (2)

Inactive • 2021-22 (T-4), 2018-19 (T-1)
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (2 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (2 components)
• 1x MWM TCG 2020
• Gas fired generating unit
Inactive • 2018-19 (T-1), 2017-18 (T-1)
Loading map...
Showing 25 locations