OCGT and Reciprocating Engines (Fuel Type - Gas)

14 unique locations (76 components)

Active MW: 20139.41 MW
Inactive MW: 10208.38 MW
Unit 28, 29, 30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (7 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
44.92 MW
Ongar Landfill Site, Mill Lane, High Ongar, Essex, CM5 9RG (6 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
10.46 MW
Land off Skinner Lane, Pontefract, WF8 1HG (9 components)
• Gas fired generating unit
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
21.87 MW
Land and Buildings Known as Teres House, Copse Road, And Land Lying to the North of East Denham Way, Fleetwood, FY7 7NY (5 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-1), 2020-21 (T-4) ...
15.47 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Foresterhill Health Campus, Aberdeen AB25 2AY (6 components)

A gas turbine installed at Aberdeen Royal Infirmary

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
6.80 MW
Cavendish Rd Stevenage SG1 2ET UK (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Bevercotes 1 Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (9 components)
• 1x 1.35MW Containerised Generating sets.
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
26.15 MW
Aveley (N), Sandy Lane, Aveley, South Ockendon, Essex, RM15 4XP (6 components)
• Gas fired generating unit
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
11.53 MW
Aveley (N) Sandy Lane Aveley South Ockendon Essex RM15 4XP (3 components)
• The site comprises of four gas reciprocating engines with an assumed output of 4.6MW. The reciprocating engines are connected to the distribution network. (2)
• Gas fired generating unit
Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
4 Finway Road, Hemel Hempstead, HP2 7PT (6 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Active • 2027-28 (T-4), 2021-22 (T-4) ...
14.23 MW
4 Finway Road Hemel Hempstead HP2 7PT (3 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW (3)

Inactive • 2020-21 (T-1), 2019-20 (T-1) ...
1A Elms Farm Industrial Estate, Edison Road, Bedford, Bedfordshire, MK41 0HU (5 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Active • 2027-28 (T-4), 2021-22 (T-1) ...
14.22 MW
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (3 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW. (3)

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Loading map...
Showing 14 locations