OCGT and Reciprocating Engines (Fuel Type - Gas)

61 unique locations (585 components) - Page 1 of 3

Wincham Lane, Wincham, Northwich CW9 6DE (8 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RR (11 components)
• 1 x jenbacher j616
• Gas reciprocating engine
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Wheldale 1 Wheldale Generation Site Wheldale Road Castleford West Yorkshire WF10 2RR (7 components)
• 2x Jenbacher J620 & 1x Jenbacher J616
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (27 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
15.01 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (13 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.14 MW
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (26 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
2.07 MW
Warsop Energy Park Carter Lane, Warsop Vale, NG20 8XG (9 components)
• 1 x MWM TCG 1.35MW
• Gas fired generating units
Inactive • 2020-21 (T-4), 2018-19 (T-1) ...
Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW (3 components)
• 20 MWs of reciprocating engine generation connecting into existing 33kV substation
• 20MWs of reciprocating engine generation connecting into an existing 33 kV pole on land at Vale Farm, Enmill Lane, Pitt, Winchester, SO22 5QW
Inactive • 2021-22 (T-4), 2020-21 (T-4)
Unit D, Kendale Rd, Scunthorpe DN16 1DT (20 components)
• Gas and/or diesel reciprocating engines.
• New build power station comprised of multiple reciprocating engines.
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
TWINYARDS FARM HUTHWAITE LANE ALFRETON DE55 5HX (7 components)
• 5 MW of demand reduction
• NEW BUILD GAS FUELLED GENERATION STATION
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
TWIN OAKS FARM LAND TO THE EAST OF YELT FARM LOWER STREET DOVERIDGE DE6 5JW (7 components)
• NEW BUILD DIESEL GENERATION STATION
• NEW BUILD GAS FUELLED GENERATING STATION
• NEW BUILD GAS GENERATION STATION
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 3, Toray Textiles Import Way Crown Farm Way Nottinghamshire NG19 0FT (9 components)
• 1 x MWM TGC 2020
• Gas fire generating unit
• Gas reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 2, Toray Textiles, Import Way Crown Farm Way Mansfield NG19 0FT (8 components)
• 1 x MWM TBG 620V 16K
• Gas reciprocating engine
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Toray 1 Toray Textiles ImportExport Crown Farm Way Mansfield Nottingham NG19 0FT (10 components)
• 1x MWM TCG 2020
• Gas fired generating unit
• Gas reciprocating engine
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (20 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2022-23 (T-4) ...
9.52 MW
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (14 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Scawby Brook, Brigg, Lincolnshire DN20 9LT (9 components)
• A Prospective New Build Gas reciprocating energy reserve facility
• Gas reciprocating energy reserve facility
Inactive • 2023-24 (T-4), 2020-21 (T-4) ...
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
• The CMU will consist of 2 MW's of containerised battery storage.
Active • 2027-28 (T-4), 2021-22 (T-4) ...
9.44 MW
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (4 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
Ongar Landfill Site Mill Lane High Ongar Essex CM5 9RG (12 components)
• 2 gas reciprocating engines rated at approximately 1MW each. All associated gas delivery equipment and switchgear is included. The generating units are connected top the distribution network.
• Gas fired reciprocating engine(s)
Inactive • 2021-22 (T-4), 2020-21 (T-4) ...
Newmarket Lane, Stanley, Near Wakefield, WF3 4BY (22 components)
• Gas fired generating units
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Monckton Energy Limited, Lundhill Lane, Royston, Barnsley, South Yorkshire. S71 4BD (2 components)
• 2 x 2.5 MW, 1 x 2.MW Gas fuelled reciprocating engines
• 2 x 2MW, 1 x 2.5MW Gas fuelled reciprocating engines
Inactive • 2021-22 (T-4), 2020-21 (T-4)
M65, Accrington BB5 5WE (10 components)
• Gas fired reciprocating engines.
• gas fired reciprocating engines
Active • 2024-25 (T-1), 2020-21 (T-4) ...
39.21 MW
Loading map...
Showing 25 locations