Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

6 unique locations (90 components)

Barking Power Station, Chequers Lane, Dagenham, Essex RM9 6PF (38 components)
• Three gas turbines operating in open cycle mode. Not a Storage Facility.
• Two gas turbines operating in open cycle mode. Not a Storage Facility
Inactive • 2017-18 (T-1), 2018-19 (T-1) ...
382.16 MW
Centrica Barry Power Station, Sully Moors Rd, Sully, CF64 5RP. (18 components)

Centrica Barry Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
363.08 MW
Deeside Power Station Weighbridge Road Zone 4, Deeside Industrial Park Deeside Flintshire CH5 2UL (9 components)
• Deeside CCGT Power Station.
• Deeside CCGT Power Station. Please note: The TEC deferral box has been ticked on the CMU Main Page. The text on the EMR Portal screen mentions Rule 3.6.3(b) and the commitment to secure TEC by 18 months before the Delivery Year. DEEP_1 is applying for the Supplementary Auction only and therefore this option has been used in relation to Rule 3.10A.2, where TEC is required by 6 months prior to the Delivery Year.
Inactive • 2017-18 (T-1), 2018-19 (T-1)
370.02 MW
Kings Lynn Power Station Willows Business Park Saddlebow, Kings Lynn PE34 3RD (8 components)

A Prospective New Build Combined Cycle Gas Turbine (CCGT) electricity generating station

Inactive • 2018-19 (T-1), 2019-20 (T-1)
547.88 MW
Knapton Generating Station, East Knapton, Malton, North Yorkshire, YO17 8JF (8 components)

Generating Station, the power generation facilities consist of RLM 6000 EGT generation package with a LM6000 gas turbine

Inactive • 2018-19 (T-1), 2019-20 (T-1)
Wytch Farm, Wareham BH20 5JR (9 components)

Two gas turbines (CX501-KB7) rated at 5.3MW each.

Inactive • 2018-19 (T-1), 2019-20 (T-1) ...
Loading map...
Showing 6 locations