Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

101 unique locations (2244 components) - Page 1 of 5

111 Brancroft Way Enfield Middlesex EN3 7PL (22 components)

Enfield CCGT Power Station - (one unit station)

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1595.21 MW
132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 5 x 9.98MW Gas Reciprocating engines with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Active • 2027-28 (T-4), 2024-25 (T-4) ...
1761.93 MW
1 Ratty's Lane, Hoddesdon, Hertfordshire, EN11 0RF (2 components)
• Combined Cycle Gas Turbine
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2026-27 (T-4)
978.65 MW
1 Ratty's Lane, Hoddesdon, Hertsfordshire, EN11 0RF (2 components)

Combined Cycle Gas Turbine

Inactive • 2023-24 (T-4), 2022-23 (T-3)
1 Ratty's Lane, Hoddesdon. Hertsfordshire. EN11 0RF (3 components)

Combined Cycle Gas Turbine

Inactive • 2022-23 (T-4), 2021-22 (T-4)
643.50 MW
Abergelli Power Station, Felindre, Swansea, SA5 7NN (2 components)

A new Open Cycle Gas Turbine (OCGT) power peaking plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Aberthaw Power Station The Leys Aberthaw Barry Mid Glamorgan CF62 4ZW (92 components)
• Aberthaw 7 OCGT fuel type gasoil
• Aberthaw 8 OCGT fuel is distillate
• Aberthaw 9 OCGT fuel type is gasoil
Active • 2024-25 (T-4), 2023-24 (T-4) ...
2434.55 MW
Address:Calder Rd, Ravensthorpe, Dewsbury, WF12 9EA. (16 components)
• Small gas fired CCGT.
• Small gas fired OCGT.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
186.17 MW
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2025-26 (T-4) ...
83.72 MW
Ashland Farm Beck Lane Skegby Sutton in Ashfield NG19 6PG (2 components)

New Build gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Baglan Bay Power Station Baglan Energy Park Port Talbot SA12 7GE (30 components)
• Existing BAGE-1 CCGT repowered with new gas turbine and substantial BOP improvements
• Existing CHP module
• Existing OCGT module
Active • 2024-25 (T-4), 2023-24 (T-4) ...
428.74 MW
Basin Road South, Portslade, East Sussex, BN41 1WF (4 components)

Combined Cycle Gas Turbine plant

Active • 2028-29 (T-4), 2023-24 (T-4) ...
573.24 MW
Brentfield Road Willesden London NW10 8JP (23 components)
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Diesel as specified in BS EN590
• Taylor's Lane OCGT GT Unit 2 Unit fuelled by Gas Oil as specified in BS2869 Class A2 Please see letter uploaded to metering section that explains calculation of Connection Capacity
• Taylor's Lane OCGT GT Unit 3 Unit fuelled by Diesel as specified in BS EN590
Active • 2028-29 (T-4), 2023-24 (T-4) ...
387.73 MW
Carrington Power Station 132 Manchester Road Carrington Manchester M31 4AY United Kingdom (48 components)
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3471.17 MW
Centrica Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT. (23 components)

Centrica Peterborough Power Station (PPS) is an Open Cycle Gas Turbine (OCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
650.00 MW
Chase Hill Road Killingholme North Lincolnshire DN40 3LU (42 components)
• Killingholme Module 1 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation
• Killingholme Module 2 converted to open cycle operation please see letter uploaded to metering section that explains determination of three highest HH
Active • 2028-29 (T-4), 2026-27 (T-4) ...
2096.76 MW
Cheshire Power Station North Road Ellesmere Port South Wirral CH65 1AF (15 components)
• One (1) Open Cycle Gas Turbine
• One (1) Open Cycle Gas Turbine MSID: 7382
• One (1) Open Cycle Gas Turbine MSID: 7382
Active • 2028-29 (T-4), 2025-26 (T-1) ...
249.14 MW
Clough Lane North Killingholme North Lincolnshire DN40 3JP (6 components)

A combined cycle gas turbine generating plant

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1282.77 MW
Corringham, Stanford-le-Hope, Essex SS17 9LP UK (3 components)

A new combined cycle power station comprising the latest technology gas turbine(s), heat recovery steam generator(s), steam turbine(s) and associated balance of plant. This will be constructed on brownfield land …

Inactive • 2021-22 (T-4), 2020-21 (T-4)
1095.30 MW
Cottam Development Centre Power Station Cottam Retford DN22 0TF (13 components)

Cottam Development Centre (CDC) CCGT single unit station

Active • 2028-29 (T-4), 2027-28 (T-4) ...
1362.24 MW
Cowes Power Station Kingston Road East Cowes Isle of Wight PO32 6JS (33 components)
• Cowes 1 - OCGT, fuel is distillate MSID: 4548
• Cowes 1 - OCGT, fuel is gas-oil
• Cowes 2 - OCGT, fuel is distillate MSID: 4548
Active • 2028-29 (T-4), 2027-28 (T-4) ...
496.48 MW
Cow Hey Lane, Runcorn, Cheshire, WA7 4FZ (14 components)

A CCGT station consisting of two Alstom GT26A gas turbines, with an Alstom heat recovery steam generator each that produces steam for one ABB steam turbine and is based near …

Active • 2028-29 (T-4), 2027-28 (T-4) ...
3037.88 MW
Loading map...
Showing 25 locations