The Manor Way, Stanford-le-Hope, Essex, SS17 9GN (12 components)

A CCGT station consisting of two Alstom GT26 gas turbines and a steam turbine and is based near Stanford-le-hope in Essex, England. Each turbine is individually metered with output being …

Active • 2022-23 (T-3), 2022-23 (T-4) ...
1985.92 MW
Sutton Bridge Power Station Centenary Way Sutton Bridge Lincolnshire PE12 9TF (29 components)
• Existing CCGT
• Existing CCGT to be refurbished
• Sutton Bridge Project: The construction at the Sutton Bridge Power CMU (23SB01), an existing Combined Cycle Gas Turbine (CCGT) plant will include both installation of new generating equipment and the upgrade or refurbishment of the current equipment at the site. The construction will include the installation of new combustion turbines (CT), installation of new CT generators, installation of a new steam turbine (ST) and ST generator, refurbishment of the heat recovery steam generators (HRSGs), installation of a new distributed control system (DCS) and balance of plant refurbishments.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
2257.82 MW
Staythorpe Power Station Staythorpe Newark Nottinghamshire NG23 5PS (46 components)
• Staythorpe 1 - CCGT MSID: 7210
• Staythorpe 2 - CCGT MSID: 7210
• Staythorpe 3 - CCGT MSID: 7210
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6018.18 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.44 MW
Power Station Road Isle of Grain Rochester ME3 0AR (82 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5014.90 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6471.35 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Active • 2025-26 (T-4), 2026-27 (T-4) ...
918.41 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6359.67 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (50 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3397.00 MW
Medway Power Station, Rochester, Medway, ME3 0AG (34 components)
• Medway
• Medway CCGT
Active • 2025-26 (T-1), 2025-26 (T-4) ...
6669.90 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (19 components)
• Gensets 1. 2 & 3
• Marchwood CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
3678.80 MW
Livesey Branch Rd, Feniscowles, Blackburn, Lancashire, BB2 5HX (14 components)
• Small Combined Cycle Gas Turbine plant with contracted connection capacity 75MVA or 60MW at 0.8PF
• Small Combined Cycle Gas Turbine plant with registered capacity 75MVA or 60MW at 0.8PF.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
220.53 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5480.84 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (77 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
2714.06 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (65 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6623.53 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (17 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2024-25 (T-4), 2025-26 (T-4) ...
499.40 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2022-23 (T-3), 2022-23 (T-4) ...
136.00 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (14 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2022-23 (T-3), 2022-23 (T-4) ...
1606.13 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (9 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2023-24 (T-4), 2024-25 (T-4) ...
1757.33 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (60 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2022-23 (T-4), 2023-24 (T-4) ...
4371.10 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (83 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
1122.73 MW
Drax Power Station, Drax, Selby, YO8 8PH (30 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2025-26 (T-1), 2025-26 (T-4) ...
337.81 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (80 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2024-25 (T-4), 2025-26 (T-4) ...
565.82 MW
Loading map...
Showing 25 locations