Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

101 unique locations (2244 components) - Page 2 of 5

Didcot B Power Station Milton Road Didcot Oxfordshire OX11 7YU (39 components)
• Didcot B5 - CCGT
• Didcot B5 - CCGT MSID: 4055
• Didcot B6 - CCGT MSID: 4055
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4732.58 MW
Didcot OCGT Power Station Didcot Oxfordshire OX11 7HA (80 components)
• Didcot 1 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
• Didcot 2 OCGT - Power factor used for conversion of kVA to MW is 1 . Fuel type is distillate MSID: 4032
• Didcot 4 OCGT - Power factor used for conversion of kVA to MW is 1 Fuel type is distillate MSID: 4032
Active • 2028-29 (T-4), 2027-28 (T-4) ...
565.82 MW
Drax Power Station, Drax, Selby, YO8 8PH (30 components)
• This CMU component is a coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-6 under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
337.81 MW
Drax Power Station, Selby, North Yorkshire, YO8 8PH (83 components)
• A coal-fired boiler turbine unit at Drax Power Station with BMU identifier T_DRAXX-5.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-10G under the BSC.
• This CMU component is an open cycle gas turbine unit fuelled by distillate with BMU identifier T_DRAXX-12G under the BSC.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1122.73 MW
EDF Energy (Thermal Generation) Limited, West Burton A Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (119 components)
• West Burton A Power Station CMU 2 WA2-19 = 100% (T_WBUPS-2) + 25% (E_WBUPS-STX)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUGT-4 = 100% (T_WBUGT-4)
• West Burton A Power Station Combined CMU WAC-22 = 100% (T_WBUPS-1) + 100% (T_WBUPS-2) +100% (T_WBUPS-3) +100% (T_WBUPS-4) +100% (T_WBUGT-1) +100% (T_WBUGT-4)+ 100% (E_WBUPS-STX) Component T_WBUPS-1 = 100% (T_WBUPS-1) + 25% (E_WBUPS-STX)
Active • 2026-27 (T-4), 2025-26 (T-4) ...
2450.85 MW
EDF Energy (Thermal Generation) Limited, West Burton B Power Station, West Burton, Retford, Nottinghamshire, DN22 9BL (13 components)
• West Burton B Power Station CMU 1 WB1-18= 100% T_WBURB-1
• West Burton B Power Station CMU 1 WB1-19= 100% T_WBURB-1
• West Burton B Power Station CMU 2 WB2-19= 100% T_WBURB-2
Active • 2024-25 (T-4), 2023-24 (T-4) ...
1246.05 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (60 components)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 6)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 7)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4371.10 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ (7 components)

EP Humber Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
EP Humber Power Station, South Marsh Road, Stallingborough, DN41 8BZ. (7 components)

EP Humber Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
252.00 MW
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW (6 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2028-29 (T-4)
EP Langage Power Station, Holland Road, Plymouth, PL7 5AW. (9 components)

EP Langage Power Station is a Combined Cycle Gas Turbine (CCGT) electricity generating station.

Active • 2027-28 (T-4), 2026-27 (T-4) ...
1757.33 MW
EP South Humber Bank Power Station, South Marsh Road, Stallingborough, DN41 8BZ (8 components)
• EP South Humber Bank Power Station Phase 1 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
• EP South Humber Bank Power Station Phase 2 is a Combined Cycle Gas Turbine (CCGT) electricity generating station.
Active • 2028-29 (T-4), 2025-26 (T-4)
263.67 MW
Factory Lane Croydon Surrey CR0 3RL (4 components)

Existing OCGT.

Active • 2028-29 (T-4), 2025-26 (T-4) ...
89.51 MW
31252.77 MW
Fort Parkway Heartlands Birmingham B24 9QT (9 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2028-29 (T-4), 2024-25 (T-4) ...
133.92 MW
Great Yarmouth Power Station South Denes Road Great Yarmouth Norfolk NR30 3PY (14 components)
• Great Yarmouth 1 - CCGT
• Great Yarmouth 1 - CCGT MSID: 7111
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1606.13 MW
Huntsman Drive, Seal Sands, TS2 1TT (6 components)

2 x Natural Gas Turbine Generators, each exhausting to a single Heat Recovery Steam Generator, supplying steam to a single Steam Turbine Generator. 1 x Auxiliary Steam package boiler natural …

Active • 2024-25 (T-1), 2023-24 (T-1)
128.51 MW
Hythe Power Station Charleston Road Hardley Hythe Southampton SO45 3BP (7 components)
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines . MSID: 7174
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode. MSID: 7174
Active • 2028-29 (T-4), 2027-28 (T-4) ...
136.00 MW
Indian Queens Power Station St. Dennis St. Austell PL26 8BY (17 components)
• Indian Queens Power Station
• Indian Queens Power Station. Extra information: Technology Class and Fuel Type: "OCGT and Reciprocating Engines: Diesel".
Active • 2028-29 (T-4), 2027-28 (T-4) ...
499.40 MW
Keadby Power Station, Keadby, Trentside, Scunthorpe, DN17 3EF (3 components)
• Single combined cycle gas turbine
• Single combined cycle gas turbine with supplementary firing
Inactive • 2021-22 (T-4), 2020-21 (T-4)
369.00 MW
Keadby Power Station Trentside, Keadby, Scunthorpe, DN17 3EF (65 components)
• Keadby 1 CCGT
• Keadby GT3
• Single combined cycle gas turbine
Active • 2028-29 (T-4), 2027-28 (T-4) ...
6623.53 MW
Kelsterton Road, Connah's Quay, Flintshire CH5 4BP (77 components)
• Connah's Quay PS Unit 2 CCGT
• Connah's Quay PS Unit 3 CCGT
• Connah's Quay PS Unit 4 CCGT
Active • 2028-29 (T-4), 2027-28 (T-4) ...
2714.06 MW
King's Lynn B Power Station, Willow Road, Willows Business Park, King?s Lynn, PE34 3RD, Norfolk (13 components)
• New build Combined Cycle Gas Turbine unit G1 at King's Lynn B.
• New build Combined Cycle Gas Turbine unit G2 at King's Lynn B.
Active • 2025-26 (T-4), 2024-25 (T-4) ...
765.00 MW
Kingsnorth, Hoo, Rochester, Kent, ME3 9TX (7 components)
• A new Combined Cycle Gas Turbine unit (unit 4) at Damhead Creek 2 power plant
• A new combined cycle gas turbine (unit 5) at Damhead Creek 2 power plant
• Combined Cycle Gas Turbine plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
5480.84 MW
Loading map...
Showing 25 locations