Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Open Cycle Gas Turbine (OCGT)

126 unique locations (2455 components) - Page 4 of 6

Livesey Branch Rd. Feniscowles. Blackburn. Lancashire. BB2 5HX (2 components)

Small Combined Cycle Gas Turbine plant Registered capacity 75MVA or 60MW at 0.8PF.

Inactive • 2021-22 (T-4), 2022-23 (T-4)
Lynchford Lane, Farnborough, GU14 6LW (3 components)

10 gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Marchwood Power, Marchwood Industrial Park, Oceanic Way, Marchwood, Southampton, SO40 4BD (19 components)
• Gensets 1. 2 & 3
• Marchwood CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
3678.80 MW
Marsh Green Industrial Park Marsh Barton Trading Estate Exeter Devon EX2 8NY (12 components)
• Existing OCGT.
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Active • 2023-24 (T-1), 2025-26 (T-4) ...
211.92 MW
Medway Power Station, Rochester, Medway, ME3 0AG (34 components)
• Medway
• Medway CCGT
Active • 2025-26 (T-1), 2025-26 (T-4) ...
6669.90 MW
Millbrook Power Station, Rookery South Pit, Green Lane, Stewartby, Bedfordshire MK43 9LX (4 components)
• A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant
• A new Open Cycle Gas Turbine (OCGT) power peaking plant
Active • 2022-23 (T-3), 2023-24 (T-4) ...
284.35 MW
Mill Lane, Kirkby in Ashfield, NG17 9LG (4 components)

5 x2MW gas reciprocating engines used for power generation, with associated infrastructure.

Inactive • 2019-20 (T-1)
Mitchell Road, Phoenix Parkway, Corby, Northamptonshire, NN17 5QT (50 components)
• The CMU is a Open Cycle Gas Turbine (OCGT)
• The CMU is a combined cycle gas turbine
• The CMU is a gas plant, capable of running in either OCGT or CCGT modes
Active • 2025-26 (T-1), 2025-26 (T-4) ...
3397.00 MW
New Hall Farm School Lane Birchwood Warrington WA3 6LH (4 components)

New Gas fulled generation station

Active • 2022-23 (T-3), 2023-24 (T-4) ...
5.70 MW
Newton Aycliffe CO Durham DL5 6EA (30 components)
• Existing Gas Engine
• This is a long standing existing Gas Engine unit on land within a manufacturing site.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
27.91 MW
Pembroke Power Station Pembroke Dyfed SA71 5SS (56 components)
• Pembroke 11 - CCGT MSID: 7237
• Pembroke 21 - CCGT MSID: 7237
• Pembroke 41 - CCGT MSID: 7237
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6359.67 MW
Peterborough Power Station, Storeys Bar Road, Peterborough, PE1 5NT (5 components)

Existing OCGT plant.

Active • 2025-26 (T-4), 2026-27 (T-4) ...
918.41 MW
Peterhead Power Station, Peterhead, Aberdeenshire, AB42 3BZ (28 components)
• Peterhead 1
• Peterhead 1 for Delivery Year 2017/18 only
• Peterhead CCGT
Active • 2024-25 (T-4), 2025-26 (T-4) ...
6471.35 MW
Power Station Road Isle of Grain Rochester ME3 0AR (82 components)
• Grain B CCGT Unit 7 Grain B power station provides heat to the Grain LNG regasification facility.
• OCGT from Grain U1. Fuel is Diesel as specified in BS EN590
• OCGT from Grain U4. Fuel is Diesel as specified in BS EN590
Active • 2024-25 (T-4), 2025-26 (T-4) ...
5014.90 MW
Progress Power Station, Eye Airfield, Diss, Suffolk, IP23 7HE (4 components)

A new 299MW Open Cycle Gas Turbine (OCGT) power peaking plant

Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Ratcliffe-on-Soar Nottingham NG11 0EE (100 components)
• Ratcliffe U2 OCGT fuelled on Diesel as defined by BS EN590
• Ratcliffe U4 OCGT fuelled on Diesel as specified by BS EN590
• Ratcliffe Unit 3 coal-fired unit
Active • 2023-24 (T-4), 2024-25 (T-4) ...
3602.30 MW
116.16 MW
Rockingham South, Smoke Land, Avonmouth BS11 0YT (7 components)
• 10 x 2MW OCGT gas reciprocating engines
• 3 x 2MW OCGT gas reciprocating engines
• 5 x 2MW OCGT gas engines The CMU will using the existing grid connection point use ty the connected CMUs which already have CM agreements. The meterign will be expanded so the CMU can be metered seperatly.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.44 MW
Rockingham South, Smoke Lane, Avonmouth, BS11 0YT. (1 component)

The CMU will consist of 1 x 2 MW OCGT gas fired engine. It will have its own individual metering arrangements, but will share the grid connection point with 4 …

Inactive • 2022-23 (T-4)
RWE Cogen UK (Hythe) Ltd Charleston Road Hardley Hythe Southampton SO45 3BP (8 components)
• Hythe Power Station - Auxiliary load behind boundary meter
• Hythe Power Station - One (1) Gas Turbine, Two (2) Steam Turbines configured to operate in Combined Cycle Mode.
• Three (3) Reciprocating Gas Engines
Inactive • 2017-18 (T-1), 2020-21 (T-4) ...
RWE Cogen UK Limited North South Access Road Seal Sands Middlesbrough TS2 1FB (2 components)

One (1) Gas Turbine and one (1) Steam Turbine operating as a CCGT

Inactive • 2021-22 (T-4)
1.63 MW
RWE Generation UK plc Ferrybridge A Workshop Site Old Great North Road Knottingley WF11 8PR (2 components)

A CMU will be formed of an Open Cycle Gas Turbine unit.

Inactive • 2022-23 (T-4)
Seabank Power Limited Severn Road, Hallen Bristol BS10 7SP (17 components)

Multi Shaft CCGT (Module 1)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
2171.63 MW
Seabank Power Limited Severn Road, Hallen, Bristol BS10 7SP (15 components)

Single Shaft CCGT (Module 2)

Active • 2023-24 (T-4), 2024-25 (T-4) ...
966.27 MW
Loading map...
Showing 25 locations