Reciprocating engines

101 unique locations (1179 components) - Page 1 of 5

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (32 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
15.01 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2028-29 (T-4), 2024-25 (T-4) ...
44.21 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (14 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
8.14 MW
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (30 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
Unit A, The Loddon Centre, Basingstoke, RG24 8QW (25 components)
• Gas reciprocating engine
• Peak power plant
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
30.00 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2028-29 (T-4), 2021-22 (T-1) ...
29.08 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury BL9 0LU (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8x2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
14.91 MW
Trumfleet Generation Site, Marsh Lane, Trumfleet, Doncaster. DN6 0DU (20 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual storage units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
28.20 MW
The Power House 38 Haughton Road Darlington DL1 1ST (26 components)
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 17.5MW of containerised, gas-fired generating capacity together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
The Long Barrow, Willesborough, Ashford, Kent. TN24 0GP (22 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2026-27 (T-4), 2022-23 (T-3) ...
9.52 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
37.69 MW
Stillingfleet Colliery Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (7 components)
• 1 x Jenbacher 420 (1.4MW)
• Reciprocating Gas Engine(s)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (9 components)
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
Shirebrook 2 Acreage Lane Shirebrook Nottinghamshire NG20 8RN (16 components)
• 1 x jenbacher JGS616 GS
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Shaw House Farm, Clitheroe Road, Whalley, Clitheroe, BB7 9AD (6 components)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
Rampside Road, Roosecote, Near Barrow-in-Furness, Cumbria LA13 0PQ (4 components)

A Prospective New Build Gas reciprocating energy reserve facility

Inactive • 2022-23 (T-4), 2021-22 (T-4) ...