Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

396 unique locations (2567 components) - Page 1 of 16

Zone P, Asfordby Business Park, Welby Road, Melton Mowbray, Leicestershire, LE14 3JL (68 components)
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating diesel generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual reciprocating generating units controlled centrally and exporting to the distribution system.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
9.05 MW
Wolverhampton Power, Northern Steel Rocks, Cross Street, Wolverhampton, WV1 2HS (16 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2028-29 (T-4), 2023-24 (T-4) ...
29.17 MW
Wincham Lane, Wincham, Northwich, CW9 6DE (17 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Willow Holme Road, Carlisle, CA3 9PF (1 component)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Willow Farm Doncaster Road Tadcaster LS24 9PA (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Whitwell Energy Park, Southfield Lane, Whitwell, Derbys S80 3LH (11 components)
• Gas reciprocating engines
• Reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
Wheldale 2 Wheldale Road Castleford West Yorkshire WF10 2RT (6 components)

Gas reciprocating engines

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Whaley Road, Barnsley, S75 1HT (1 component)

The CMU Component will be made up of gas fired engines.

Inactive • 2022-23 (T-4)
West Road North, Cross Green, Leeds, West Yorkshire, LS10 1RR (3 components)
• Gas engines in a peaking plant environment
• New gas engines in a peaking plant environment, servicing power generation and DSR.
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
29.30 MW
Weighbridge Rd, Deeside CH5 2LL, UK (2 components)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Waun y Pound Industrial Estate, Ebbw Vale, South Wales, NP23 6PL (32 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution and gas networks.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
15.01 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (14 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
8.14 MW
Watling Road Bishop Auckland DL14 9AS (5 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (5 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Water Orton, Birmingham, B46 1NU (3 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (30 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.07 MW
Warren Park Way, Enderby, Leicester, LE19 4SA (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Warren House Farm, Rossington, DN11 0HP (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (4 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
17.10 MW
Units A1-4, 730 London Road, West Thurrock RM20 3NL (1 component)

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-4)
Loading map...
Showing 25 locations