Reciprocating engines

16 unique locations (87 components)

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.96 MW
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components)

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Outclough Farm, Biddulph Road, Stoke-on-Trent ST6 8UW (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
11.41 MW
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
94.65 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (10 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.39 MW
Land on the south east side of Rycote Lane, Milton Common, Thame,  OX9 2PB (6 components)

Gas peaking reciprocating engine

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
0.01 MW
Land off Orwell Street, Grimsby, DN31 3HF (4 components)

New reciprocating gensets in acoustic enclosure

Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.65 MW
LAND AT NORTH OF HOMEFIELD ROAD ST EDMUNDSBURY CB9 8QU (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.85 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components)

Gas fired reciprocating engine(s)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.85 MW
Heathfield Landfill, John Acres Lane, Kingsteignton, Devon, TQ12 3GP (2 components)

The CMU at the Heathfield Landfill site in Devon will be made up of three reciprocating engines generating from natural gas. In their current state, these engines have been designed …

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Hamilton Road, Sutton-in-Ashfield, NG17 5ES (8 components)
• A 10MW new build gas fuelled generating station.
• A 7MW new build gas fuelled generating station.
• A new build gas fuelled generating station.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
28.37 MW
Currock Road, Carlisle, Cumbria CA2 5AD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
CPG Power Manchester Rd, Carrington, Manchester M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.12 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW
A65, Kirby Lonsdale, Carnforth, LA6 2HH (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines. (2)

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
53 Valley Road Plymouth PL7 1RF (9 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
19.04 MW