Reciprocating engines

11 unique locations (73 components)

Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (13 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU Component will have a connection capacity of 3.376MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
9.96 MW
On land off Nairn Road, Deans Industrial Estate, Livingston, EH54 8AY (6 components)

A new build, gas fuelled generation station.

Active • 2025-26 (T-4), 2024-25 (T-4) ...
94.65 MW
North Avenue, Marston Green, Birmingham, B40 1NT. (10 components)

Gas Generator - ENER-G 1521 - proposed to be installed on land to the north-east elevation of Hall 5 at the NEC Site.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
4.39 MW
Lymedale Business Park, Holditch Road, Newcastle-under-Lyme, Staffordshire,ST5 9JA (1 component)

Holditch Power will be a 9.36MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2024-25 (T-4)
8.72 MW
Land at Queens Road, Immingham, DN40 1QR (10 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
89.83 MW
Land at Orwell Street, East Marsh, Grimsby DN31 3HF Grimsby (4 components)

New reciprocating gensets in acoustic enclosure

Active • 2024-25 (T-4)
3.73 MW
Kirkless Landfill Site, Hemfield Close, Kirkless, Higher Ince, Wigan, WN2 2DW (3 components)

Gas fired reciprocating engine(s)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
2.85 MW
Currock Road, Carlisle, Cumbria CA2 5AD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (12 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.80 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components)
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.78 MW
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment. (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.08 MW
Loading map...