Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

6 unique locations (14 components)

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Prowse's Lane, Axbridge, BS26 2HP. (3 components) Geocoding Needed

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Axbridge Axbridge +1 more BS26
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
19.66 MW
Marshall Road, Plympton, Plymouth, PL7 4NW (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Linketty Lane Linketty Lane Not Prequalified PL7
Active β€’ 2024-25 (T-4)
11.33 MW
Llay Grid Capacity Site, Llay Hall Farm, Llay, Wrexham, LL12 0TH (4 components) Geocoding Needed
β€’ 3.4MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
β€’ 3MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.
Active β€’ 2025-26 (T-4), 2024-25 (T-1) ...
9.30 MW
Land East of B1256, Dunmow CM6 1EW (1 component) Geocoding Needed

Total installed capacity is 6.9MW gas reciprocating engines to be installed on designated land within a compound.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Great Dunmow Not Prequalified CM6
Active β€’ 2025-26 (T-4)
6.59 MW
Church Field Road, Sudbury, CO10 2YA (3 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED GREAT DUNMOW POWER LIMITED New Build Generating CMU Sudbury Sudbury A +1 more Not Prequalified CO10
Active β€’ 2025-26 (T-4), 2024-25 (T-4)
20.30 MW
Chicks Lane, Chewton Mendip, BA3 4BY (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Chewton Not Prequalified BA3
Active β€’ 2024-25 (T-4)
4.38 MW
Loading map...
Showing 6 locations