Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

4 unique locations (12 components)

Active MW: 14652.51 MW
Inactive MW: 930.44 MW
Scawby Brook, Scawby, Brigg, DN20 9LT. (4 components)

Brigg Gas Peaker (3)

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU 8RESAK 8RESAK DN20
Active • 2026-27 (T-4), 2025-26 (T-1) ...
135.85 MW
Scawby Brook, Brigg, Lincolnshire DN20 9LT (5 components)

A Prospective New Build Gas reciprocating energy reserve facility (3)

Active • 2024-25 (T-4), 2023-24 (T-4) ...
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Not Prequalified CF35
Active • 2025-26 (T-1)
37.21 MW
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Stanford le hope (A) Stanford le hope (B) CF35
Active • 2026-27 (T-4)
38.07 MW
Loading map...
Showing 4 locations