Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

54 unique locations (791 components) - Page 1 of 3

4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (3 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
25.71 MW
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
18.90 MW
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Batleys Cash and Carry Gielgud Way Coventry CV2 2SZ (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2024-25 (T-1), 2024-25 (T-4) ...
39.67 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (27 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2024-25 (T-4), 2025-26 (T-4) ...
28.70 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (16 components)

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2023-24 (T-1), 2024-25 (T-4) ...
27.31 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (22 components)
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
51.60 MW
Common Lane, Wath upon Dearne, Rotherham, South Yorkshire, S63 7DX (10 components)
• Battery energy storage unit
• New reciprocating genset in acoustic enclosure
Active • 2019-20 (T-1), 2020-21 (T-4) ...
0.69 MW
Cowley Hill Works Boilerhouse, Albert Street, St Helens, WA10 2RZ (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2020-21 (T-4), 2021-22 (T-4) ...
9.16 MW
Currock Trade Centre, Currock, Carlisle, Cumberland CA2 5AD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2028-29 (T-4)
29.92 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QG (5 components)

10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2024-25 (T-4), 2026-27 (T-4) ...
36.98 MW
Dig Gate Lane, Lady House, Milnrow, Rochdale, Greater Manchester, England, OL16 4NR (2 components)
• A Distribution Connected Battery Energy Storage System.
• A Distribution Connected gas fueled generating station.
Active • 2028-29 (T-4)
10.40 MW
Dig Gate Lane, Rochdale, OL16 4NR (3 components)

4.4MW gas fired peaking power plant

Active • 2026-27 (T-4), 2027-28 (T-4) ...
12.45 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
37.75 MW
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (3 components)

A new build gas fuelled generation plant with ancilliary equipment.

Active • 2028-29 (T-4)
37.40 MW
Greengate Works Power Station, Sutton Heath Road or Burtonhead Road, St Helens, WA9 5DS (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
28.28 MW
Griffiths Road, Lostock Gralam, Northwich, CW9 7XU (11 components)
• 20 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 20MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
• 6MW power plant comprising gas reciprocating engines. The power plant is connected to the local electricity distribution network and local gas network.
Active • 2022-23 (T-3), 2023-24 (T-4) ...
74.78 MW
Hoon Hay Manor, Marston Lane, Hatton, Derby, DE65 5EA (30 components)

Reciprocating genset

Active • 2025-26 (T-1), 2027-28 (T-4) ...
17.49 MW
Kiln Power, Unit 6, Lime Kilns Business Park, Nutts Lane, Hinckley, Leicestershire, LE10 3EL. (45 components)
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
• Kiln Power is a 16 MW power plant comprising gas reciprocating engines. The export of the power plant is connected to the local distribution network via two separately metered 8MW connections (of which this is one of the two CMU components) and it is connected to the local gas network. connections and it is connected to the local gas network. Kiln Power has a single Balancing Service ID - NGSTORKILN218. To distinguish between the two components of the CMU a numbering system has been used. The two components are separately metered.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
119.74 MW
Land at Enterprise Court, Corby, NN18 8ES (83 components)

Reciprocating genset

Active • 2024-25 (T-1), 2025-26 (T-1) ...
55.87 MW
Land at Hindlip Lane, Worcester, WR3 8SB (2 components)

7.5MW gas fired peaking power plant

Active • 2028-29 (T-4)
7.01 MW
Land at Kestral Road, Mansfield, NG18 5FU (11 components)

Reciprocating genset in acoustic enclosure

Active • 2022-23 (T-1), 2023-24 (T-1) ...
18.48 MW
Land at Queens Road, Immingham, DN40 1QR (8 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2018-19 (T-1), 2021-22 (T-4) ...
29.54 MW
Land lying to the north west of Staithes Road, Hull, HU12 8DX (13 components)
• 21 MW power plant comprising 11 gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 21MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Active • 2018-19 (T-1), 2021-22 (T-4) ...
38.89 MW
21.56 MW
Loading map...
Showing 25 locations