Reciprocating engines

902 unique locations (6047 components) - Page 1 of 37

10-14 Birmingham Road, West Bromwich, B71 4LD (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
1020 Slutchers Lane, Centre Park, Warrington, WA1 1QL (9 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16 MW power plant comprising gas reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Inactive •
112 Beddington Lane, Croydon, CR0 4TB (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive •
132 Manchester Road, Carrington, Manchester, M31 4AY (12 components)
• 50MW supply system with 250MWh of batteries with all ancillary equipment to be installed on the Trafford Power Site
• New combined cycle gas turbine unit comprising the latest technology gas turbines, heat recovery steam generators, steam turbines and associated balance of plant. This will be constructed on Carrington Manchester
• One 4.5MW Gas Reciprocating engine with all ancillary equipment to be installed on the Trafford Power Site
Inactive •
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (7 components)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
• CMU consisting of multiple reciprocating engines and alternators
Inactive •
1A Elms Farm Industrial Estate Edison Road Bedford Bedfordshire MK41 0HU (26 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW.

Inactive •
1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD (2 components)
• AN 8MW new build gas generating station..
• CMU FES002 which is an electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 8MW. The CMU is located at: 1 Kirkshaw Lane, Ferrybridge, Knottingley, WF11 8RD.
Active • 2024-25 (T-4)
15.24 MW
1 Maxwell Road, Woodston Industrial Estate, Peterborough PE2 7JB (7 components)
• This CMU is 10*2MW reciprocating engines using HVO.
• This CMU is 10*2MW reciprocating engines.
• This CMU is 6*2MW reciprocating engines.
Active • 2023-24 (T-1), 2025-26 (T-1) ...
37.40 MW
20 Wallace Way Hitchin SG4 0SE (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive •
23 Whittle Road, Ferndale Industrial Estate, Wimborne, BH21 7PW (8 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive •
25 Southfield Lingard Lane Stockport SK6 2QN (21 components)

1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear

Inactive •
2 South Wardpark Place, Wardpark, Cumbernauld, Glasgow, North Lanarkshire, G67 3HX (37 components)
• New build gas generator
• Operational Reciprocating Engine
• Operational gas reciprocating engine.
Inactive •
3 Nairn Road, Deans Industrial Estate, Livingston, West Lothian, EH54 8AY (13 components)
• Newbuild gas generator
• Reciprocating engine (natural gas fuelled)
Inactive •
46 Station Road Stokesley Middlesbrough TS9 7AA (16 components)
• 2 x 2.25 Gas reciprocating engines to be installed at Cleveland Nurseries (replacing existing CHP)
• Gas CHP engines in commercial horticultural usage with no auxilliary load
Inactive •
4 Chemistry Lane, Pentre, Deeside CH5 2DA, UK (3 components)

14MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.

Active • 2028-29 (T-4)
25.71 MW
4 Chemistry Lane, Pentre, Deeside, CH5 2DW (5 components)

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Inactive •
4 Chemistry Ln, Pentre, Deeside, CH5 2DA (24 components)
• Peak power plant
• Reciprocating engine
Inactive •
4 Finway Road Hemel Hempstead HP2 7PT (25 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 5MW

Inactive •
4 Guildford Road Cranleigh GU6 8PE (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
525 Brenda Rd, Hartlepool TS25 1HT (7 components)

Gas fired reciprocating engines.

Inactive •
Loading map...
Showing 25 locations