Reciprocating engines

59 unique locations (832 components) - Page 1 of 3

Worset Lane, Hartlepool, TS27 3BQ (3 components)

A new build, gas fuelled generation station

Active • 2027-28 (T-4), 2028-29 (T-4)
46.47 MW
Woodhouse Energy Centre A. Pearson and Sons? Nursery Alderley Edge SK9 7UW (16 components)
• The CMU Component will have a connection capacity of 3.298MW net of 46kW auxiliary load. Gas-fired reciprocating engine will be the technology used.
• The CMU component is installed in the Woodhouse Energy Centre that is located at a Nursery site in Alderley Edge.
• The CMU component, CASQ17 supplies heat, CO2 and electricity to the onsite nursery and facilities.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
9.05 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (15 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
Active • 2018-19 (T-1), 2020-21 (T-4) ...
44.21 MW
Warne Road, Weston Super-Mare, BS23 9JZ (2 components)

New-build gas reciprocating engine.

Active • 2028-29 (T-4)
37.96 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (25 components)

A generating station consisting on multiple reciprocating engines and alternators located on a single site

Active • 2023-24 (T-4), 2024-25 (T-4) ...
8.06 MW
Unit 28,29,30, Peel Mills Industrial Estate, Chamberhall Street, Bury, BL9 0LU (18 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
• Reciprocating Engine
Active • 2018-19 (T-1), 2020-21 (T-4) ...
29.08 MW
Unit 2, 105 Abercorn Street, Paisley, PA3 4AT (20 components)
• New build gas generator
• Operational reciprocating gas engines
Active • 2022-23 (T-4), 2023-24 (T-4) ...
15.06 MW
Traston Road, Off Corporation Road, Newport , Gwent, NP19 4RQ (26 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
28.20 MW
Titanium Road, Waunarlwydd, Swansea, SA5 4NH (2 components)

New gas reciprocating engines to be installed and/or existing plant to be refurbished/replaced to operate on green bio-fuel.

Active • 2028-29 (T-4)
37.40 MW
The Canalside, Marsh Lane, off Showground Road, Bridgwater, Somerset, TA6 6LQ (19 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
37.69 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station. (3)

Active • 2022-23 (T-3), 2022-23 (T-4) ...
75.88 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (35 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2023-24 (T-4), 2024-25 (T-4) ...
24.33 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (12 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2022-23 (T-1), 2022-23 (T-3) ...
14.08 MW
Stather Road, Flixborough, DN15 8RR (5 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Active • 2022-23 (T-3), 2022-23 (T-4) ...
2.24 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (14 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
44.63 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (18 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
18.70 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (10 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2022-23 (T-3), 2022-23 (T-4) ...
1165.32 MW
Rochester Power Generation Plant, Whitewall Road, Medway City Estate, Rochester, Kent, ME2 4DZ (13 components)
• Existing Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2023-24 (T-4), 2024-25 (T-1) ...
52.07 MW
Redscar Business Park, Preston, PR2 5NJ (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Active • 2028-29 (T-4)
29.92 MW
Redditch Generation Station, Windsor Road, Redditch, B97 6HE (2 components)
• Battery Storage Station
• Gas reciprocating engines as the generating unit.
Active • 2025-26 (T-4), 2028-29 (T-4)
26.22 MW
Rassau Industrial Estate, Ebbw Vale, South Wales, NP23 5SD (26 components)
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines. Power plant will be connectd to the WPD distribution network and WWU gas network.
• 16 MW power plant comprising 8 x 2MW gas reciprocating engines.The Power plant is connected to the WPD distribution network and WWU gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Active • 2022-23 (T-3), 2022-23 (T-4) ...
74.45 MW
Prince of Wales Road, Darnall, South Yorkshire, Sheffield, S9 4EX, United Kingdom (2 components)

A New Build gas generating station..

Active • 2028-29 (T-4)
4.68 MW
Plot 3, Forge Way, Knypersley, Staffordshire, ST8 7DN (3 components)

Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network

Active • 2028-29 (T-4)
13.11 MW
Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (3 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Old Littleton Road, Chertsey, Surrey, TW17 9NU (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2024-25 (T-1), 2027-28 (T-4) ...
40.79 MW