Reciprocating engines

689 unique locations (1847 components) - Page 11 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Kirkhaw Lane Knottingley WF11 8RD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional WF11
Inactive • 2019-20 (T-1)
Kirkhaw Lane, Knottingley, WF11 8RD (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
3.81 MW
Kirkless Landfill Site, Makerfield Way, Kirkless, Higher Ince, Wigan, WN2 2PR (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional WN2
Inactive • 2022-23 (T-4)
1.90 MW
Kitching Road, Peterlee, County Durham, SR8 2HP (3 components)
• 10 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 11 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Kitching Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
Reciprocating engines ARL 012 Limited New Build Generating CMU Conditional SR8
Inactive • 2022-23 (T-4)
39.01 MW
Knightsbridge Farm, Yarnton, Oxford, OX5 1PH (2 components)

11x 4.5MW gas fuelled generators installed on a compound on land at Knightsbridge farm.

Reciprocating engines KNIGHTSBRIDGE ENERGY CENTRE LIMITED New Build Generating CMU Not Prequalified OX5
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
Knowsley Park Way, Hasslingdon, Rossendale, BB4 4HU (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Knowsley Not Prequalified BB4
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Knypersley Generation Unit G, Brown Lees Industrial Estate, Knypersley, Staffordshire, ST8 7DN (8 components)
• The CMU Component is made up of brand new gas-fired engines.
• The CMU Component is made up of reciprocating diesel engines.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
Land 15, J3 Business Park, Carr Hill, Balby, Doncaster, DN4 5JT (1 component)

A new build gas fuelled generating station.

Inactive • 2019-20 (T-1)
9.51 MW
19.00 MW
Land adjacent to Netherlands Way / Europa Way, Stallingborough, Grimsby, DN41 8DT (6 components)
• 10 x 2MW gas reciprocating engines
• 10x 2MW Gas Reciprocating Engines
Inactive • 2023-24 (T-4), 2022-23 (T-3)
56.99 MW
Land Adjacent to Stobarts Logistics Off Branthwaite Road Lillyhall Workington Cumbria CA14 4ED (2 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
LAND ADJOINING RIMA HOUSE RIPPLE ROAD BARKING IG11 0RH (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Gallions Power IG11
Inactive • 2021-22 (T-1), 2020-21 (T-1)
LAND ADJOINING RIMA HOUSE, RIPPLE ROAD, BARKING, IG11 0RH (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.75 MW
Land and Buildings Known as Teres House Copse Road And Land Lying to the North of East Denham Way Fleetwood FY7 7NY (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear (3)

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Land and Buildings Known as Teres House, Copse Road, And Land Lying to the North of East Denham Way, Fleetwood, FY7 7NY (5 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear

Inactive • 2021-22 (T-1), 2020-21 (T-4) ...
15.47 MW
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD TORQUAY TQ2 8JG (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Arden Power Not Prequalified TQ2
Inactive • 2020-21 (T-1)
LAND AND BUILDINGS LYING TO THE EAST OF BARTON HILL ROAD, TORQUAY, TQ2 8JG (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
4.82 MW
LAND AND BUILDINGS LYING TO THE SOUTH EAST OF ROMAN ROAD WHEATLEY OX33 1LH (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Waterperry Power Not Prequalified OX33
Inactive • 2020-21 (T-1)
LAND AND BUILDINGS LYING TO THE SOUTH EAST OF ROMAN ROAD, WHEATLEY, OX33 1LH (3 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.41 MW
LAND AT 20 WALLACE WAY HITCHIN SG4 0SE (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Wallace Power SG4
Inactive • 2021-22 (T-1), 2020-21 (T-1)
LAND AT 20 WALLACE WAY, HITCHIN, SG4 0SE (4 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
3.80 MW
Land at 7-11 Knapps Lane, Bristol, BS5 7EY (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
15.21 MW
LAND AT ANDOVER COMMERCIAL PARK ANDOVER SP11 8BF (2 components)

CMU consisting of multiple reciprocating engines and alternators (2)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Centric Power Not Prequalified SP11
Inactive • 2021-22 (T-1), 2020-21 (T-1)
Loading map...
Showing 25 locations