Reciprocating engines

902 unique locations (6047 components) - Page 2 of 37

53 Valley Road Plymouth PL7 1RF (16 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive •
62 Marlborough Road Lancing Business Park Lancing BN15 8UF (5 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive •
7 COWLEY WAY CREWE CW1 6AE (8 components)

CMU consisting of multiple gas reciprocating engines and alternators

Inactive •
84 Bridge St, Wednesbury WS10 0AN (1 component)

New build power station comprised of multiple reciprocating engines

Inactive •
A19 Business Park (Riccall Business Park), Riccall, North Yorkshire YO19 6QR (4 components)

Gas generation peaking plant comprising of 9 x 2MW engines

Inactive •
A65, Kirby Lonsdale, Carnforth, LA6 2HH (3 components)
Inactive •
A66 and Tees Dock Road, Grangetown TS6 7HJ (4 components)

New build power station comprised of multiple reciprocating engines.

Inactive •
Aaron Road Industrial Estate Peterborough Cambridgeshire PE7 2EX (17 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
ABBOTSHAUGH RESERVE POWER FACILITY, ABBOTTS ROAD, FALKIRK, FK2 7XU (2 components)

Front of the meter 10 x 2MW Gas Reciprocating Engines installed to generate power and export to the local Distribution Network.

Inactive •
Aberaman Industrial Estate (South Bound), Aberaman, Nr Aberdare, Rhondda Cynon Taff, CF44 6DA (21 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2021-22 (T-4), 2022-23 (T-3) ...
18.90 MW
Abercorn Street, Paisley, PA3 4DF (8 components)

A new build, gas fuelled generation station.

Inactive •
Accrington Road, Burnley, Lancashire, BB11 5DP (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Inactive •
Adjacent to Seal Sand Bulk Storage Facility Seal Sands Stockton-on-Tees Cleveland TS2 1UB (8 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Inactive •
Adsworth Road, Stockport, SK3 8LF (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
Albion Close, Worksop, Nottinghamshire, S80 1RA (5 components)

New reciprocating genset in acoustic enclosure

Inactive •
Aldon Road, Poulton-le-Fylde, Lancashire FY6 8JL (6 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Inactive •
Alne Material Recovery Facility, Forest Lane, Alne, York, YO61 1TU (14 components)
• Existing Generating CMU comprising of a gas fuelled reciprocating engine and gas delivery plant.
• New Build Generating CMU comprising of a CHP asset producing energy from waste.
Active • 2023-24 (T-1), 2024-25 (T-1) ...
14.36 MW
Anchor Lane Abbess Roding Ongar CM5 0JR (19 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive •
Appley Bridge Landfill Appley Lane N Appley Bridge Wigan WN6 9AD (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive •
Applied Automation Eastern Wood Road Langage Industrial Estate PL7 5ET (17 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive •
APS Growers Ltd / Branfield Nursery 111 Stockbridge Road Elloughton HU15 1HW (27 components)
• One Jenbacher CHP engine with a generation capacity of 3.36 MW
• The new Energy Centre will consist of one Jenbacher CHP engine with a generation capacity of 3.36 MW and a thermal output of 3.984 MW.
Active • 2024-25 (T-4), 2025-26 (T-4) ...
18.47 MW
Loading map...
Showing 25 locations