Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

904 unique locations (6057 components) - Page 22 of 37

Land on the south west of Brigg Road, Scunthorpe, North Lincolnshire, DN16 1AP (14 components)
• Gas engine system capable of exporting electricity.
• Multiple gas engines capable of exporting electricity.
Active • 2024-25 (T-4), 2023-24 (T-4) ...
9.52 MW
Land on the west side of Progress Road, Eastwood, SS9 5PR (1 component)

CMU consisting of multiple reciprocating engines and alternators

Active • 2025-26 (T-4)
3.43 MW
Land on west side of Droppingwell Road, Sheffield, S61 2DW (2 components)

3 x 2MW gas generator units to be installed on a compound adjacent to Droppingwell Road

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Land South of Anchor Lane, Bilston, WV14 9NA (7 components)
• A new build gas fuelled generating station.
• Gas fuelled generators installed on a compound to the south of Anchor Lane
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land South of Harwich Road, Lawford, Manningtree, Essex, CO11 2LY (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4)
6.87 MW
Land south of Holyhead Road, Ketley, Telford, TF1 5HS (2 components)

20 x 2MW gas fuelled generators installed on a compound on land south of Holyhead Road, Ketley

Inactive • 2023-24 (T-4), 2022-23 (T-3)
LAND SOUTH OF SANDHURST ROAD CANVEY ISLAND SS8 0QY (9 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
1.90 MW
Land to East of Peel Road, Blackpool, FY4 5LN (2 components)

10 x 2MW gas fuelled reciprocating engines installed on a compound on land to east of Peel Road.

Inactive • 2023-24 (T-4), 2022-23 (T-3)
20.97 MW
Land To The East Of Fire Station Green Lane Bishop Auckland DL14 6RS (7 components)

a new build gas generating station

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.50 MW
"Land to the east of Marl Road, Knowsley, Kirkby, L33 7UH (9 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
land to the east of Worset Lane, Hartlepool, TS27 3BG (4 components)

A new build, gas fuelled generation station.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
Land to the east side of Brunel Road, Manor Trading Estate, Benfleet, Essex, SS7 4PS (11 components)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
LAND TO THE NORTH-EAST SIDE OF BRYN ROAD ASHTON-IN-MAKERFIELD WN4 8BX (10 components)

CMU consisting of multiple reciprocating engines and alternators

Inactive • 2023-24 (T-4), 2022-23 (T-1) ...
Land To The North Of 3 Haywood Way Hastings, TN35 4NR (7 components)
• CMU consisting of multiple reciprocating engines and alternators
• CMU consisting of multiple reciprocating engines and alternators.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
33.52 MW
Land to the north of A1079, Cottingham, HU17 0RP (4 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4)
Land to the rear of Hawley House, Outgang, Lane Dinnington, Rotherham. (3 components)

New reciprocating engines housed within acoustic enclosures

Inactive • 2019-20 (T-1)
Land to the South of Clay Hill off Hamlet Hill CM19 5JR (2 components)

Gas reciprocating engines

Active • 2028-29 (T-4), 2023-24 (T-4)
46.74 MW
Land to the South of Clay Hill off Hamlet Hill, CM19 5JR (2 components)

Gas reciprocating engines

Active • 2025-26 (T-4), 2023-24 (T-4)
47.73 MW
Land to the south of the A883, Falkirk Road, near Bonnybridge FK4 1SN. This site pre-qualified last year as CFBS13 (2 components)

The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV.

Inactive • 2022-23 (T-3), 2022-23 (T-4)
Land to the West of Chapterhouse Close, Ellesmere Port, CH65 4EL (2 components)

49.9 MW Gas Reciprocating Engines envisaged to be made up of multiple modules.

Inactive • 2023-24 (T-4)
47.40 MW
Land to the west (see map) of 18-20 Netherdale Rd, Netherton Industrial Estate, Wishaw ML2 0ER (8 components)
• The facility consists of a lithium Ion battery storage system capable of importing, storing and exporting electricity. It connects to SPEN?s 33kV distribution network at 33kV
• The facility consists of a series of gas fired generators. It connects to SPEN?s 33kV distribution network at 33kV
Inactive • 2022-23 (T-3), 2022-23 (T-4) ...
Land west of Basildon substation, Lower Dunton Road, Basildon, Essex, CM13 3SX (1 component)

Energy Centre comprising of Lean Burn, Acoustically Treated Natural Gas Reciprocating Engines.

Inactive • 2022-23 (T-4)
Land west of Cadwell Lane, Hitchin, SG4 0AG (2 components)

3 X 2MW gas fuelled generators installed on a compound on land to the west of Cadwell Lane

Inactive • 2023-24 (T-4), 2022-23 (T-3)
Loading map...
Showing 25 locations