Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

904 unique locations (6057 components) - Page 28 of 37

Petre Road, Oakenshaw, Clayton-le-Moors, Hyndburn, Lancashire, England, BB5 5JB (3 components)

A Distribution Connected gas fueled generating station.

Active • 2028-29 (T-4)
14.96 MW
Philip Steet Bristol BS2 0TA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
Phillips Lane, Colne, BB8 9PQ (6 components)

A gas fuelled generating station.

Inactive • 2022-23 (T-3), 2023-24 (T-4)
4.75 MW
Picow Farm Rd, Runcorn WA7 1DA (1 component)

Gas peaking reciprocating engines

Inactive • 2022-23 (T-4)
Pilsworth North, Moss Hall Road, Pilsworth, Bury, Lancashire, BL9 7JL (2 components)

The CMU at the Pilsworth North Landfill site near Bury will be made up of four reciprocating engines generating from natural gas. In their current state, these engines have been …

Inactive • 2022-23 (T-3), 2023-24 (T-4)
Pilsworth Rd, Heywood OL10, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
Pioneer Mill, Milltown St, Radcliffe, Manchester, M26 1WN (1 component)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Pioneer Rd, Andover SP11 8HJ, UK (1 component)

A generating station consisting of multiple reciprocating engines and alternators located on a single site.

Inactive • 2022-23 (T-4)
PLOT 11 MID SUFFOLK BUSINESS PARK EYE IP23 7HU (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Plot 3a Dukes Drive Kingmoor Park CA6 4SL (13 components)
• Existing power station comprised of multiple reciprocating engines
• New build power station comprised of multiple reciprocating engines.
Inactive • 2019-20 (T-1), 2020-21 (T-1) ...
Plot 3, Forge Way, Knypersley, Staffordshire, ST8 7DN (3 components)

Knypersley Power will be a 7.012MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network

Active • 2028-29 (T-4)
13.11 MW
Plot 4 Hermitage Park, Harts Farm Way, Havant, PO91FA (1 component)

A new build, gas fuelled generation station

Active • 2026-27 (T-4)
19.04 MW
Plot 4, South Kirkby Business Park, Hemsworth, WF9 3TJ (6 components)
• A 20MW New Build gas fuelled generating station.
• A 8MW New Build gas fuelled generating station.
Inactive • 2021-22 (T-4), 2022-23 (T-3) ...
Plot A3, Watervole Way, Doncaster, DN4 5JP (4 components)
• A 20MW new build gas generating station..
• A new build gas generating station.
Inactive • 2019-20 (T-1), 2020-21 (T-4)
Plot A Land at Severn Road Avonmouth BS10 7SE (4 components)
• 10 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Avonmouth Energy Park
• Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear
Active • 2023-24 (T-4), 2024-25 (T-4)
19.04 MW
Plot A Land at Waterswallows Road, Buxton, SK17 7JT (4 components)
• 2 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
• 5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road
Active • 2024-25 (T-4)
16.00 MW
Plot B Land at Severn Road Avonmouth BS10 7SE (1 component)

Containerised High Speed Gas-fired reciprocating engines together with transformers, switchgear and associated control gear

Inactive • 2023-24 (T-4)
Plot B Land at Waterswallows Road, Buxton, SK17 7JT (2 components)

5 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Waterswallows Road

Active • 2024-25 (T-4)
Plot D2, Kingdom Avenue, Westbury, Wiltshire, South West England, England, BA13 4EW (10 components)

A 7.220MW reciprocating gas engine power plant comprising of 5 x 1.5MW engines to be installed on designated land at West Wilts Trading Estate.

Active • 2022-23 (T-1), 2023-24 (T-1) ...
26.18 MW
Plot D, Faraday Business Park, Solent Airport, Daedalus, Lee-on-the-Solent, Hampshire, PO13 9FW (2 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Inactive • 2022-23 (T-3), 2023-24 (T-4)
Plot G11, Bennett St, Bridgend Industrial Estate, Bridgend, CF31 3RS (3 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2022-23 (T-4)
Plot N2C, Castle Road, Sittingbourne, ME10 3SQ (16 components)
• A generating station consisting of multiple reciprocating engines and alternators located on a single site. Voltage to be transformed, where appropriate, to export.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2021-22 (T-1), 2022-23 (T-1) ...
Pontefract Road, Stourton, Leeds, LS10 1AZ (7 components)

New reciprocating genset in acoustic enclosure

Inactive • 2019-20 (T-1), 2020-21 (T-4)
Loading map...
Showing 25 locations