Reciprocating engines

517 unique locations (2569 components) - Page 3 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Batleys Cash and Carry, Talbot Road, Fareham, PO15 5RY (9 components) Geocoding Needed
• A completed power plant, with associated civil works, switchgear and electrical connection.
• The CMU component is net of the auxiliary power required
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.67 MW
Belvedere Lane, Milton Keynes, MK17 9JH (2 components) Geocoding Needed
• 3 x 2MW Gas fuelled generator units to be installed on designated land within a compound at Belvedere Nurseries
• Grid-scale energy storage system based on Lithium Ion, capable of exporting 8MW for a 1 hour duration installed on designated land within a compound at Belvedere Nurseries
Reciprocating engines Storage (Duration 1h) FPC ELECTRIC LAND LIMITED New Build Generating CMU Belvedere A Belvedere B Not Prequalified MK17
Active • 2025-26 (T-4)
7.33 MW
Bentinck Electricity Generating Plant, Mill Lane, Kirkby In Ashfield, Nottinghamshire, NG17 9LG (2 components) Geocoding Needed

Gas engine peaker plant providing capacity market, power trading and other balancing services.

Active • 2024-25 (T-4), 2021-22 (T-1)
11.43 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LG (2 components) Geocoding Needed

A 7.5MW new build gas generating station..

Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU FERRY1 FERRY1 NG17
Active • 2026-27 (T-4), 2025-26 (T-1)
14.15 MW
Bentinck Generating Station, Mill Lane, Nottinghamshire NG17 9LJ (4 components) Geocoding Needed
• A 7.5MW new build gas generating station..
• An electrical power generating unit comprised of multiple gas reciprocating engines with an aggregated exporting capacity totalling 4.5MW.
Active • 2027-28 (T-4), 2025-26 (T-1) ...
19.78 MW
Bevercotes Energy Park West Drayton Avenue Bevercotes Nottinghamshire DN22 8DB (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Portfolio DN22
Active • 2024-25 (T-1)
Bevercotes Energy Park, West Drayton Avenue, Bevercotes, Nottinghamshire, DN22 8DB (4 components) Geocoding Needed
• 3 x 1MW / 1.2 MWh BYD Lithium Ion Battery
• Gas reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-1) ...
4.90 MW
Blankenham Nursery, Great Blankenham, Bramford, Ipswich, Suffolk, IP8 4JU (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Bramford Not Prequalified IP8
Active • 2027-28 (T-4)
6.79 MW
Bond Avenue, Bletchley, Milton Keynes, MK1 1JJ (5 components) Geocoding Needed

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2021-22 (T-1) ...
16.97 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components) Geocoding Needed

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.81 MW
Booker Cash and Carry, Didcot, OX11 7HJ (6 components) Geocoding Needed

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.58 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Hatfield Peak Gen Power Hatfield +2 more AL10
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.19 MW
Booker Cash and Carry, Frobisher Way, Hatfield, Hertfordshire, AL10 9TR (9 components) Geocoding Needed

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.99 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Reciprocating engines SEDG (MINERS) LTD New Build Generating CMU Booth Lane Not Prequalified CW11
Active • 2026-27 (T-4)
42.83 MW
Booth Lane, Sandbach, Cheshire CW11 3PY (1 component) Geocoding Needed

A gas fueled distribution connected generating station

Reciprocating engines BLUEFIELD ENERGY LIMITED New Build Generating CMU BOOTH28 Rejected CW11
Active • 2028-29 (T-4)
23.37 MW
Booth Lane, Sandbach, Cheshire, CW11 3PY (1 component) Geocoding Needed

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components) Geocoding Needed
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
32.77 MW
Bowlers Croft, Basildon, SS14 3HH (2 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bowlers Power Not Prequalified SS14
Active • 2025-26 (T-4), 2022-23 (T-1)
4.84 MW
Brampton Lane, Chapel Brampton, Northampton, NN6 8BA (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines CHAPEL BRAMPTON POWER LTD New Build Generating CMU Chapel Brampton Not Prequalified NN6
Active • 2024-25 (T-4)
5.29 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (4 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norwich Norwich +1 more Not Prequalified NR6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.41 MW
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (CHP) LIMITED New Build Generating CMU Not Prequalified SK15
Active • 2026-27 (T-4)
1.43 MW
Bridge Street, Stalybridge, SK15 1PH (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2026-27 (T-4)
1.43 MW
Bristol Royal Infirmary, Marlborough Hill, Bristol, BS2 8HW (6 components)

1 * 1.7MW diesel reciprocating engine (3)

Active • 2026-27 (T-4), 2025-26 (T-4) ...
2.91 MW
Loading map...
Showing 25 locations