Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 42 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Southbrook Farm, Sudbrook, Caldicot, NP26 5SR (3 components)

10 x 2MW gas generator units to be installed on designated land within Southbrook Farm

Reciprocating engines Energion Ltd. New Build Generating CMU Southbrook Farm Southbrook Farm Not Prequalified NP26
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
SOUTH CLOSE ROSYTON SG8 5UH (4 components)

CMU consisting of multiple reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Orchard Power Orchard Power +1 more SG8
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.74 MW
SOUTH CLOSE, ROSYTON, SG8 5UH (7 components)

CMU consisting of multiple reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.23 MW
South Cornelly Trading Estate, Porthcawl Road, Bridgend, CF33 4RE (15 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU South Cornelly Power Station South Cornelly Power Station +8 more CF33
Active • 2028-29 (T-4), 2027-28 (T-4) ...
73.28 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (3 components)
• New Build Generating CMU comprising of battery storage and associated plant.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2026-27 (T-4), 2023-24 (T-4) ...
11.84 MW
Southmoor Lane, Havant, PO9 1JW (2 components)
• A new power plant, with associated civil works, switchgear and electrical connection.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Langstone Not Prequalified PO9
Active • 2024-25 (T-4), 2020-21 (T-4)
23.60 MW
Spalding Drove, Spalding, PE12 6BL (1 component)

Generating unit

Reciprocating engines ENEL X UK LIMITED Existing Generating CMU PE12
Active • 2025-26 (T-4)
Sparrowhawk Road, Halesworth, East Suffolk, IP19 8QW (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (HALESWORTH) LIMITED New Build Generating CMU Halesworth Halesworth +1 more IP19
Active • 2024-25 (T-4), 2023-24 (T-1) ...
20.58 MW
Speke Hall Avenue, Speke, Liverpool, L24 8DA (3 components)
• A new build, battery energy storage system
• A new build, gas fueled generation station.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
24.56 MW
Springmill Road, Leeds LS12 1BS (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU SWEET STREET Conditional LS12
Inactive • 2022-23 (T-4)
6.66 MW
Stangate Landfill Site, Off Quarry Hill Road, Borough Green, Kent, TN15 8PG (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional TN15
Inactive • 2022-23 (T-4)
3.62 MW
St Asaph Power, Glascoed Road, St Asaph, Denbighshire LL17 0LQ (11 components)
• 16 MW power plant comprising of 8 x 2MW gas fired reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16 MW power plant comprising of reciprocating engines.The Power plant is connected to the local distribution and gas network.
• 16MW Power plant comprising reciprocating engines. The Power plant is connected to the local distribution and gas network.
Reciprocating engines ST ASAPH POWER LIMITED Existing Generating CMU St Asaph Power St Asaph Power +5 more LL17
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.88 MW
Stather Road, Flixborough, DN15 8RR (5 components)
• 2 x 1.2mw gas generator units to be installed on designated land at Stather Raod
• 2.4MW gas fired peaking power plant
• A gas fuelled generating station comprised of multiple reciprocating engines
Reciprocating engines ARL 018 LIMITED New Build Generating CMU Stather Road Stather Road +1 more Conditional DN15
Active • 2028-29 (T-4), 2025-26 (T-4) ...
9.10 MW
Station Road, Cuffley, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Cuffley Not Prequalified EN7
Active • 2024-25 (T-4)
7.14 MW
Station Road, Forest Row, RH18 5EN (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
3.81 MW
Station Road, Peterborough, Cambs, PE7 2EX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN (4 components)
• A new build 3MW gas fuelled generating station.
• A new build 8MW gas fuelled generating station.
Reciprocating engines Coldharbour Power Reserve Limited New Build Generating CMU LITTLEFAIR2 LITTLEFAIR2 +1 more Conditional HU9
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
8.56 MW
Steelridge Ltd, Littlefair Road, Kingston Upon Hull, HU9 5LN. (4 components)
• A New Build 5MW Gas Fuelled Generating Station.
• A New Build 8MW Gas Fuelled Generating Station.
Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
24.67 MW
Stevenage Road, Knebworth, Stevenage, Hertfordshire, SG3 6PX (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4)
7.12 MW
Stevenage Road, Knebworth, Stevenage, SG2 8QQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Steventon Road, Abingdon, OX13 6RW (5 components)
• 5 x 1mw gas generator units to be installed on designated land at Steventon Road - Connection offer is for 13mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
• A new build 6MW gas fuelled generating station.
Reciprocating engines ARL 028 Limited New Build Generating CMU Steventon Road Conditional OX13
Active • 2024-25 (T-4), 2023-24 (T-4) ...
30.90 MW
Steventon Road, Abingdon,OX13 6RW (1 component)

A new build 6MW gas fuelled generating station.

Reciprocating engines ARL 028 Limited New Build Generating CMU Steventon Not Prequalified OX13
Active • 2024-25 (T-4)
Stewartby Landfill Site, Green Lane, Stewartby, Bedfordshire, MK43 9LY (2 components)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU Stewartby Solar Not Prequalified MK43
Active • 2025-26 (T-4), 2022-23 (T-4)
3.41 MW
Stillingfleet Colliery, Cawood Road, Stillingfleet Moor, Stillingfleet, Yorkshire, YO19 6HS (4 components)
• 1 x Jenbacher 420 (1.4MW)
• Reciprocating Gas Engine(s)
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
18.05 MW
Loading map...
Showing 25 locations