Reciprocating engines

1206 unique locations (4419 components) - Page 43 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Stockclough Lane, Blackburn, BB2 5JR (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Stone Circle, A6, Shap, Cumbria, CA10 3PZ (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FORSA ENERGY (BERYL STREET) HOLDINGS LIMITED New Build Generating CMU Shapell2 Shapfell1 Not Prequalified CA10
Active • 2024-25 (T-4)
42.85 MW
Stone Circle, Shap, Cumbria, CA10 3PZ (2 components)
• A new build gas fuelled generation station
• A new build, gas fuelled generation station
Reciprocating engines AVONMOUTH GENERATION LIMITED New Build Generating CMU Fell Energy Shap Energy CA10
Active • 2027-28 (T-4)
42.46 MW
STONE CROSS LANE, GOLBORNE, WA3 2SF (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
4.82 MW
Stourton Estates, Hatton, LN8 5QL (1 component)

As indicated this CMU is linked to EDP112. EDP112 gained a T-4 CM contract in the CM16 auction. This CMU application enables a separate portion of a new build gas …

Reciprocating engines Edge Power (Allen Farm East) Limited New Build Generating CMU Allen Farm East Rejected LN8
Inactive • 2022-23 (T-4)
9.50 MW
Stratford Road, Alcester, B49 6NN (9 components)
• 10 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• 20 x 1mw gas generator units to be installed on designated land at Stratford Road - Connection offer is for 41.24mw which is split between CMUs - further detail in covering letter
• A gas fuelled generating station.
Reciprocating engines BRK 010 LIMITED New Build Generating CMU Stratford Road A Stratford Road B +1 more Conditional B49
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
77.95 MW
Styal Road, Wythenshawe, Manchester, M22 5WB (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Moss Nook Not Prequalified M22
Active • 2025-26 (T-4)
7.16 MW
Substation at Saltend Lane, Preston, East Riding of Yorkshire, HU12 8EY (5 components)
• Bio-liquid fuelled distribution connected generation station
• Gas fuelled distribution connected generation station
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
74.79 MW
Sutton Courtenay Landfill Site, Appleford Sidings, Sutton Courtenay, Abingdon, Oxfordshire, OX14 4PW (4 components)
• Gas fired reciprocating engine(s)
• Solar PV generation site
• The site comprises of gas reciprocating unit(s)
Solar Photovoltaic Reciprocating engines ALKANE ENERGY UK LIMITED New Build Generating CMU SUTTONCOURTENAY Sutton Courtenay Solar Conditional OX14
Active • 2025-26 (T-4), 2023-24 (T-4) ...
6.08 MW
Sutton Farm Sutton Lane Broughton Astley Leicester, LE9 6QF (6 components)

New build power station comprised of multiple reciprocating engines. (2)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU SUTTON SUTTON LE9
Inactive • 2020-21 (T-1), 2019-20 (T-1)
Sutton Farm, Sutton Lane, Broughton Astley, Leicester, LE9 6QF (16 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.07 MW
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (1 component)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Reciprocating engines SUTTON POWER LIMITED Existing Generating CMU Sutton Manor WA8
Inactive • 2022-23 (T-1)
Sutton Manor Grid Capacity Site, Union Bank Farm, Warrington Road, Bold Bridge, St Helens, WA8 5UT (6 components)

3.000MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
11.35 MW
TAMDOWN WAY SPRINGWOOD INDUSTRIAL ESTATE BRAINTREE ESSEX CM7 2QL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Tamdown Power Not Prequalified CM7
Inactive • 2020-21 (T-1)
TAMDOWN WAY, SPRINGWOOD INDUSTRIAL ESTATE, BRAINTREE, ESSEX, CM7 2QL (3 components)

CMU consisting of a gas reciprocating engine and alternator

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
2.41 MW
Tarmac, Anderton Road, Small Heath, Birmingham, B11 1TG (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU TARMAC Conditional B11
Inactive • 2022-23 (T-4)
7.14 MW
Tarmac, Whitefield Road, Bredbury, SK6 2QP (2 components)

7MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land.

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Bredbury Not Prequalified SK6
Inactive • 2023-24 (T-4), 2022-23 (T-3)
6.65 MW
Tees Valley Nursery, The Moat, Belasis Hall, TS23 4ED (21 components)
• The CMU component TEES01 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
• The CMU component TEES02 is one gas-fired Jenbacher CHP engine. It will be supplying heat, CO2 and power to the on-site tomato Nursery all year.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
40.32 MW
Tewin Road, Welwyn Garden City, AL7 1BD (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines WGC ENERGY CENTRE LIMITED New Build Generating CMU WGC ENERGY CENTRE LIMITED Not Prequalified AL7
Active • 2026-27 (T-4)
17.13 MW
Thatcham Grid Substation, Piper's Lane, Off Station Road, Thatcham, RG19 4NA (10 components)
• 6 x reciprocating engines
• Aux. load separately metered
Active • 2025-26 (T-4), 2024-25 (T-4) ...
16.59 MW
The Bath Inn, Wheldon Road, Castleford WF10 2RY (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU CASTLEFORD Conditional WF10
Inactive • 2022-23 (T-4)
6.66 MW
'The Black Shed', Belleknowes Industrial Estate, Inverkeithing, KY11 1HY (5 components)

A new build, gas fuelled generation station.

Reciprocating engines BELLEKNOWES GENERATION LIMITED New Build Generating CMU Belleknowes Generation Limited Belleknowes Generation Limited +2 more KY11
Active • 2025-26 (T-4), 2024-25 (T-4) ...
75.88 MW
Loading map...
Showing 25 locations