Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1206 unique locations (4419 components) - Page 47 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Units 1 To 6 Pin Green Industrial Estate Whitworth Road Stevenage, SG1 4QS (1 component)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Senate Power Not Prequalified SG1
Active • 2025-26 (T-4)
4.84 MW
Units A1-4, 730 London Road, West Thurrock RM20 3NL (1 component)

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Purfleet Power Limited New Build Generating CMU Purfleet Power Conditional RM20
Inactive • 2022-23 (T-4)
18.84 MW
Units A, B, C and D, Postley Road, Kempston, Bedford, MK42 7AG (3 components)

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO 2) LIMITED New Build Generating CMU Postley Power MK42
Active • 2025-26 (T-4), 2023-24 (T-1) ...
9.22 MW
UNITS A, B, C & D, POSTLEY ROAD, KEMPSTON, BEDFORD, MK42 7AG (1 component)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4)
4.82 MW
Vacant land, Old Ively Road, Farnborough, Hampshire, GU14 0LX (3 components)

16MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Farnborough Power Limited New Build Generating CMU Farnborough Power Farnborough Power Limited GU14
Active • 2024-25 (T-4), 2023-24 (T-4) ...
30.05 MW
Vacant land, Portsdown Technology Park, Southwick Rd, Portsmouth, Hampshire, PO6 3RU (3 components)

20MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Portsdown Power Limited New Build Generating CMU Portsdown Power Portsdown Power PO6
Active • 2024-25 (T-4), 2023-24 (T-4) ...
37.66 MW
Vause Farm, Town Ln, Charnock Richard, Chorley PR7 5HQ (3 components)
• New build 10no. twin gas generators with 10no. transformers, switchgear and ancillary requirements.
• New build 9no. twin gas generators with 9no. transformers, switchgear and ancillary requirements.
Reciprocating engines FLEXITRICITY LIMITED New Build Generating CMU Conditional PR7
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
34.22 MW
Villa Nursery, Reeves Lane, Roydon, Harlow, Essex, CM19 5LE (14 components)
• A generating station consisting on multiple reciprocating engines and alternators located on a single site
• CMU consisting of multiple reciprocating engines and alternators
Active • 2028-29 (T-4), 2027-28 (T-4) ...
14.36 MW
Visitors Car Park, Alexandra Park, WA10 3UJ (2 components)
• Diesel or gas generating station.
• gas generating station.
Reciprocating engines SWB ST HELENS LTD New Build Generating CMU Leafield Energy Limited Leafield Energy Limited WA10
Inactive • 2020-21 (T-4), 2019-20 (T-1)
26.50 MW
Wainwright Street, Hollins, Dukinfield, Tameside, Greater Manchester, England, SK16 5PL (2 components)

A Distribution Connected gas fueled generating station.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Sandy Lane 1 Sandy Lane 2 SK16
Active • 2028-29 (T-4)
14.96 MW
Walley New Road, BB1 9SR (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Blackburn Not Prequalified BB1
Active • 2024-25 (T-4)
6.67 MW
Wallingford Road, Goring, Reading RG8 0HP (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Goring Not Prequalified RG8
Active • 2024-25 (T-4)
6.78 MW
Wallingford Road, Goring, Reading, RG8 0HS (3 components)

A 6.9MW gas fuelled generating station.

Reciprocating engines GORING POWER LTD New Build Generating CMU GORING GORING +1 more RG8
Active • 2026-27 (T-4), 2025-26 (T-1) ...
19.53 MW
Warne Road, Weston Super-Mare, BS23 9JZ (1 component)

New-build gas reciprocating engine.

Reciprocating engines GREEN RESERVE LIMITED New Build Generating CMU Not Prequalified BS23
Active • 2028-29 (T-4)
18.98 MW
Warren House Farm, Rossington, DN11 0HP (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional DN11
Inactive • 2022-23 (T-4)
19.03 MW
Warren Park Way, Enderby, Leicester, LE19 4SA (4 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
• A new build gas fuelled power generating unit comprising multiple reciprocating engines.
Reciprocating engines ENDERBY POWER LTD New Build Generating CMU ENDERBY2 Enderby +1 more Conditional LE19
Active • 2024-25 (T-4), 2023-24 (T-4) ...
15.75 MW
Warsop Energy Park, Carter Lane, Warsop Vale, NG20 8XG (15 components)
• 1 x MWM TBG2016 engine 1.35MW
• Gas fired generating unit
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
26.37 MW
Water Orton, Birmingham, B46 1NU (2 components)

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional B46
Inactive • 2022-23 (T-4)
39.29 MW
Waterswallows Lane, Buxton, Derbyshire SK17 7JD (4 components)

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 119 Ltd New Build Generating CMU Waterswallows Waterswallows +1 more Conditional SK17
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Waterswallows Lane, Buxton, SK17 7HP (1 component)

Energy facility comprising of reciprocating engine sets.

Reciprocating engines STOR 120 Ltd New Build Generating CMU Barms Not Prequalified SK17
Active • 2024-25 (T-4)
19.04 MW
Water Treatment Plant & Premises, Land to the south of Rumer Hill Road, Cannock WS11 8EX (2 components)
• Gas fired generating unit(s)
• Gas fired generating units
Inactive • 2022-23 (T-4), 2021-22 (T-4)
9.31 MW
Watling Road Bishop Auckland DL14 9AS (1 component)

New build power station comprised of multiple reciprocating engines.

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU Conditional DL14
Inactive • 2019-20 (T-1)
Watling Road, Bishop Auckland, DL14 9AS (2 components)

New build power station comprised of multiple reciprocating engines.

Inactive • 2022-23 (T-4), 2019-20 (T-1)
7.61 MW
Watson Street Power Station, Burtonhead Road, St Helens, WA9 5EA (14 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Watson Street Power Station Watson Street Power Station +7 more WA9
Active • 2027-28 (T-4), 2026-27 (T-4) ...
56.80 MW
Waun-y-Pound Industrial Estate, Ebbw Vale, Gwent, NP23 6PL (9 components)
• 16MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• Peak power plant
DSR Reciprocating engines CLYNE POWER LIMITED Existing Generating CMU CMU - Unproven DSR KIWI74 Clyne Power +4 more NP23
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.56 MW
Loading map...
Showing 25 locations