Reciprocating engines

517 unique locations (2572 components) - Page 6 of 21

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Elm Court Estate, Capstone Road, Gillingham, ME7 3JQ (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Lordswood Not Prequalified ME7
Active • 2025-26 (T-4)
6.87 MW
ENTERPRISE POWER, 11 - 12 ENTERPRISE WAY, WESTWOOD INDUSTRIAL ESTATE, MARGATE, CT9 4JA (4 components)

CMU consisting of multiple gas reciprocating engines and alternators

Active • 2024-25 (T-4), 2023-24 (T-1) ...
9.52 MW
Europa Energy Centre, Hills Court Road, Ash, Kent, CT3 2AP (15 components)
• The CMU Component will have a connection capacity of 15MW. Gas-fired reciprocating engine will be the technology used.
• The CMU component BREH01 consists of one CHP engine supplying heat, CO2 and power to the on site Nursery.
• The CMU component BREH02 consists of one CHP engine supplying heat, CO2 and power to the on-site Nursery.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
104.20 MW
Excalibur Road, Beacons Park, Gorleston, Great Yarmouth, Norfolk NR31 7RQ (10 components)

New build power station comprised of multiple reciprocating engines.

Active • 2024-25 (T-4), 2023-24 (T-4) ...
53.26 MW
Eyre Street, Birmingham, B18 7AD (3 components)
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines
• A gas fuelled electrical power generating unit comprising multiple reciprocating engines.
Reciprocating engines EYRE STREET POWER LIMITED New Build Generating CMU EYRE STREET Eyre Street B18
Active • 2024-25 (T-4), 2023-24 (T-4) ...
13.31 MW
Faraday Road, Plymouth, PL4 0ST (6 components)
• Gas fired reciprocating engines.
• Reciprocating Engines
Active • 2024-25 (T-4), 2021-22 (T-4) ...
75.75 MW
Felindre Rd, Pencoed, Bridgend, CF35 5HU (2 components)

A new build, gas fuelled generation station

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Stanford le hope (A) Stanford le hope (B) CF35
Active • 2026-27 (T-4)
38.07 MW
Felindre Road, Pencoed, Brigend, CF35 5HU (1 component)

New build 40MW gas Peaker plant

Reciprocating engines CENTRICA DISTRIBUTED GENERATION LIMITED New Build Generating CMU Not Prequalified CF35
Active • 2025-26 (T-1)
37.21 MW
Ffordd Penamser Road, Porthmadog, Gwynedd, LL49 9GB (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Porthmadog Not Prequalified LL49
Active • 2025-26 (T-4), 2022-23 (T-1)
4.77 MW
Fire Station Lane, Avonmouth, Bristol, BS11 9EH (4 components)

Gas fired reciprocating engines.

Reciprocating engines GFPII Limited New Build Generating CMU VI026 VI026 +1 more BS11
Active • 2024-25 (T-4), 2023-24 (T-4) ...
76.06 MW
Five Mile Drive, Upton Wold, Moreton-In-Marsh, WR12 7LD (9 components)
• New build site with gas reciprocating engines to replace diesel plant
• New state-of-the-art green bio-fuel reciprocating engines replacing existing diesel reciprocating engines.
• STOR diesel engines that will operate environmentally with mixed fuels
Reciprocating engines GFI73 LTD NORTHWICK POWER GENERATION NO 1 LIMITED New Build Generating CMU Northwick Northwick WR12
Active • 2028-29 (T-4), 2027-28 (T-4) ...
81.33 MW
Former Johnson's Lane Landfill Site, Johnson's Lane, Widnes, Cheshire WA8 0SH (1 component)

Power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines WP GRID STORAGE 7 LIMITED New Build Generating CMU Widnes Power Station Not Prequalified WA8
Active • 2027-28 (T-4)
12.17 MW
Former Johnson's Lane Landfill Site, Johnson's Lane, Widnes, Cheshire, WA8 0SH (1 component)

Power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Active • 2027-28 (T-4)
12.17 MW
Former Slag Processing Plant Port Clarence Road, Port Clarence, Stockton-on-Tees, TS2 1TT (2 components)

Gas reciprocating engines

Reciprocating engines TEESSIDE FLEXIBLE GENERATION 2 LIMITED TEESSIDE FLEXIBLE GENERATION LIMITED New Build Generating CMU Teesside Flexible Generation 2 Limited Teesside Flexible Generation Limited Not Prequalified TS2
Active • 2027-28 (T-4)
94.26 MW
Fort Parkway, Heartlands, Birmingham, B24 9QT (22 components)
• Existing OCGT
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output
• The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output.
Reciprocating engines Open Cycle Gas Turbine (OCGT) OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Heartlands Power Heartlands Power +4 more B24
Active • 2028-29 (T-4), 2027-28 (T-4) ...
909.77 MW
Garden Lane Cadeby Doncaster DN5 7SN (1 component)

Gas reciprocating engines.

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU Askern DN5
Active • 2024-25 (T-1)
0.82 MW
Garden Lane, Cadeby, Doncaster, DN5 7SN (7 components)
• 1 x 2MW CAT G3520CPKG
• Gas fired generating engines
• Gas reciprocating engines.
Active • 2025-26 (T-4), 2024-25 (T-1) ...
33.23 MW
Gas Works Road, Lowestoft, NR32 1UZ (4 components)
• New Build CMU comprising of battery storage and associated plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Active • 2024-25 (T-4), 2023-24 (T-1) ...
22.62 MW
Gate Lodge, Boundary Farm, Styal Road, Wythenshawe, Manchester, M22 5YA (16 components)
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual gas units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Styal Road Power Station Styal Road Power Station +8 more M22
Active • 2028-29 (T-4), 2027-28 (T-4) ...
80.96 MW
Generation Compound Land Off Titanium Road, Swansea, SA5 4SG (1 component)

A new build gas fuelled generation plant with ancilliary equipment.

Reciprocating engines ELECTRIC LAND & POWER LIMITED New Build Generating CMU SWANSEA095 Not Prequalified SA5
Active • 2028-29 (T-4)
18.70 MW
Getrag Ford Transmissions, Speke Boulevard, Halewood, Liverpool L24 9LE (1 component)

MTU gas engines (1.5MW and 2.0MW) but restricted export capacity to 2.7MW.

Reciprocating engines GFT Energy Centre Ltd New Build Generating CMU Rejected L24
Active • 2024-25 (T-4)
Grain Road Isle of Grain Rochester ME3 0AB (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (3)

Reciprocating engines CONRAD (GRAIN) LIMITED New Build Generating CMU Grain Grain +1 more ME3
Active • 2024-25 (T-1), 2023-24 (T-1) ...
13.27 MW
Grain Road, Isle of Grain, Rochester, ME3 0AB (6 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Active • 2025-26 (T-4), 2024-25 (T-4) ...
26.62 MW
Grand Union Canal Walk, Hayes UB3 4DG (3 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CS15 Limited New Build Generating CMU Hyde NorthHyde20 Not Prequalified UB3
Active • 2024-25 (T-4), 2023-24 (T-4) ...
93.20 MW