Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1208 unique locations (4420 components) - Page 6 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Blauegate Works, Stanley Way, Lathom, Skelmersdale, WN8 8EA (4 components) Geocoding Needed
• Total installed capacity is 6.6MW of gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
• Total installed capacity is 7,952kW OF gas reciprocating engines to be installed on designated land within a manufacturing compound at Blauegate Works.
Reciprocating engines BLAGUEGATE POWER LIMITED New Build Generating CMU Blauegate Blauegate +1 more WN8
Inactive • 2022-23 (T-4), 2022-23 (T-1) ...
20.14 MW
Boarhunt Rd, Fareham, PO17 6AJ (2 components) Geocoding Needed

Gas fired reciprocating engines

Reciprocating engines Dockside Power Limited New Build Generating CMU Down Barn Farm PO17
Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.67 MW
Bond Avenue Bletchley Milton Keynes MK1 1JJ (3 components)

The CMU component comprises of three 2MW Reciprocating Gas Engines (3)

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) CONRAD (BLETCHLEY) LIMITED Existing Generating CMU Bond Estates Milton Keynes Bond Estates Milton Keynes MK1
Inactive • 2021-22 (T-1), 2019-20 (T-1) ...
Bond Avenue, Bletchley, Milton Keynes, MK1 1JJ (5 components) Geocoding Needed

The CMU component comprises of three 2MW Reciprocating Gas Engines

Active • 2028-29 (T-4), 2021-22 (T-1) ...
16.97 MW
Bones lane, Cheddleton, Leek, Staffordshire, ST13 7BT (6 components) Geocoding Needed

1.9 MW Gas gen ENER-G 1999

Active • 2025-26 (T-4), 2024-25 (T-4) ...
5.81 MW
Booker Cash and Carry Didcot OX11 7HJ (3 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Didcot Peak Gen Power Didcot +1 more OX11
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
3.14 MW
Booker Cash and Carry, Didcot, OX11 7HJ (6 components) Geocoding Needed

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2026-27 (T-4), 2025-26 (T-4) ...
12.58 MW
Booker Cash and Carry Frobisher Way Hatfield Hertfordshire AL10 9TR (4 components)

A completed power plant, with associated civil works, switchgear and electrical connection. (3)

Reciprocating engines PEAK GEN POWER LIMITED Existing Generating CMU Peak Gen Power Hatfield Peak Gen Power Hatfield +2 more AL10
Active • 2024-25 (T-1), 2023-24 (T-1) ...
9.19 MW
Booker Cash and Carry, Frobisher Way, Hatfield, Hertfordshire, AL10 9TR (9 components) Geocoding Needed

A completed power plant, with associated civil works, switchgear and electrical connection.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
33.99 MW
Booth Lane Sandbach Cheshire CW11 3PY (1 component)

A new build gas fuelled generating station.

Reciprocating engines SEDG (MINERS) LTD New Build Generating CMU Booth Lane Not Prequalified CW11
Active • 2026-27 (T-4)
42.83 MW
Booth Lane, Sandbach, Cheshire CW11 3PY (1 component) Geocoding Needed

A gas fueled distribution connected generating station

Reciprocating engines BLUEFIELD ENERGY LIMITED New Build Generating CMU BOOTH28 Rejected CW11
Active • 2028-29 (T-4)
23.37 MW
Booth Lane, Sandbach, Cheshire, CW11 3PY (1 component) Geocoding Needed

A new build gas fuelled generating station.

Active • 2026-27 (T-4)
42.83 MW
Boot Lane, Sandbach, Cheshire CW11 3PY (2 components) Geocoding Needed
• 20MW of Battery Energy Storage Systems
• 26.000MW of Reciprocating Engines
Active • 2025-26 (T-4)
32.77 MW
Bourton, Buckingham, MK18 7DU (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Buckingham Not Prequalified MK18
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Bowlers Croft, Basildon, SS14 3HH (2 components) Geocoding Needed

CMU consisting of multiple reciprocating engines and alternators

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Bowlers Power Not Prequalified SS14
Active • 2025-26 (T-4), 2022-23 (T-1)
4.84 MW
Bradford Road, Batley, Kirklees, WF17 6JS (18 components) Geocoding Needed
• 1 x Containerised High Speed Gas-fired reciprocating engines with an output of 2.5MW together with transformers, switchgear and associated control gear
• 20MW of containerised, gas-fired generation together with transformers, switchgear and associated control gear
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
56.99 MW
Bradgate Landfill Site, Bradgate Hill, Markfield, Leicester, Leicestershire, LE6 0FA (1 component) Geocoding Needed

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional LE6
Inactive • 2022-23 (T-4)
1.90 MW
Brampton Lane, Chapel Brampton, Northampton, NN6 8BA (1 component) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines CHAPEL BRAMPTON POWER LTD New Build Generating CMU Chapel Brampton Not Prequalified NN6
Active • 2024-25 (T-4)
5.29 MW
Bransdale Road, Kippax, Leeds, WF10 2AX (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU LEDSTON Conditional WF10
Inactive • 2022-23 (T-4)
4.52 MW
Briar Chemicals, Sweet Briar Road, Norwich, NR6 5AP (4 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) II LIMITED New Build Generating CMU Norwich Norwich +1 more Not Prequalified NR6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
30.41 MW
Bridge Road North, Wrexham Industrial Estate, Wrexham, LL13 9QS (1 component) Geocoding Needed

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Reciprocating engines Edge Power (Little Blakesware) Limited New Build Generating CMU 2018 20MW THREE Rejected LL13
Inactive • 2022-23 (T-4)
19.03 MW
Bridge Road, Wrexham Industrial Estate, LL13 9PS (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU ARDAGH WREXHAM Conditional LL13
Inactive • 2022-23 (T-4)
9.51 MW
Bridge Street, Stalybridge, SK15 1PH (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (CHP) LIMITED New Build Generating CMU Not Prequalified SK15
Active • 2026-27 (T-4)
1.43 MW
Loading map...
Showing 25 locations