Reciprocating engines

689 unique locations (1847 components) - Page 6 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, CM9 5FA (1 component)

14 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Blackwater Power Limited New Build Generating CMU Blackwater Power Conditional CM9
Inactive • 2022-23 (T-4)
13.13 MW
Connect House, Bates Road, Quayside Industrial Estate, Maldon, Essex, CM9 5FA (3 components)
• 14MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating Engines Reciprocating engines CONRAD (HEYBRIDGE) LIMITED New Build Generating CMU Blackwater Power Blackwater Power CM9
Inactive • 2022-23 (T-1), 2020-21 (T-4) ...
26.47 MW
Cotton Valley STW, Portway, Milton Keynes, MK15 9LZ (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU COTTON VALLEY Conditional MK15
Inactive • 2022-23 (T-4)
19.03 MW
CPG Power, Manchester Rd, Carrington, Manchester, M31 4AY, UK (3 components)
• This CMU [CGTN_4] will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
• This CMU will be formed of multiple gas reciprocating units controlled centrally & exporting to the Transmission system.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
141.12 MW
Crookham Common Road, Thatcham, RG19 8BR (2 components)

Gas fired reciprocating engines.

Inactive • 2022-23 (T-4), 2021-22 (T-4)
36.09 MW
Cuckoo Road, Nechells, Birmingham, B7 5TR (2 components)

New reciprocating genset in acoustic enclosure

Reciprocating engines FRP MERCIA HOLDCO LIMITED New Build Generating CMU Cuckoo Road Cuckoo Road B7
Inactive • 2020-21 (T-4), 2019-20 (T-1)
14.99 MW
Cuffley Hill, Cuffley, Potters Bar, EN7 5HA (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
7.14 MW
Cuffley Hill, Cuffley, Potters Bar, Hertfordshire, EN7 5HA (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.12 MW
Dafen Power, Llethri Road, Dafen Park Industrial Estate, Llanelli, SA14 8QN (5 components)
• 10 MW power plant comprising 5 x 2MW gas fired reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant is connected to the local distribution network and local gas network.
• 10 MW power plant comprising of 5x2MW gas fired reciprocating engines. The power plant will be connected to the local distribution network and local gas network.
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
27.92 MW
Daneshill Landfill Site, Daneshill Road, Lound, Nr Retford, Nottinghamshire, DN22 8RB (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional DN22
Inactive • 2022-23 (T-4)
2.71 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 0LR (2 components)

Gas fired reciprocating engine(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU DANESMOSS Not Prequalified SK11
Inactive • 2023-24 (T-4), 2022-23 (T-3)
3.61 MW
Danes Moss Landfill Site, Gawsworth, Macclesfield, Cheshire, SK11 9QP (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional SK11
Inactive • 2022-23 (T-4)
3.88 MW
Davy Drive Peterlee SR8 2JF (3 components)

New build power station comprised of multiple reciprocating engines. (3)

Reciprocating engines HARTREE SOLUTIONS (UK) LIMITED New Build Generating CMU PETERLEE PETERLEE SR8
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Davy Road Astmoor Industrial Estate Runcorn WA7 1PZ (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)

Reciprocating engines CONRAD (RUNCORN) LIMITED New Build Generating CMU Runcorn Runcorn WA7
Inactive • 2022-23 (T-1), 2021-22 (T-1)
Davy Road, Astmoor Industrial Estate, Runcorn, WA7 1PZ (4 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
12.86 MW
Deanprint, Cheadle Heath, Works, Stockport Road, Stockport, SK3 0PR (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU STOCKPORT ROAD Conditional SK3
Inactive • 2022-23 (T-4)
4.76 MW
Derwent Power Plant, Holme Lane, Spondon, Derby, DE21 7NT (2 components)
• CMU S22DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system
• CMU S23DPP will be formed of multiple individual generating units controlled centrally and exporting to the distribution system
Reciprocating engines UK UTILITY RESERVE LIMITED New Build Generating CMU Derwent Power Station Derwent Power Station Not Prequalified DE21
Inactive • 2023-24 (T-4), 2022-23 (T-3)
94.79 MW
Distington Landfill Site, Pitwood Road, Lillyhall, Workington, Cumbria, CA14 4JP (1 component)

The site comprises of gas reciprocating unit(s)

Reciprocating engines INFINIS ALTERNATIVE ENERGIES LIMITED New Build Generating CMU Conditional CA14
Inactive • 2022-23 (T-4)
1.90 MW
Dogsthorpe Landfill Site Welland Road Peterborough Cambridgeshire PE1 4TE (2 components)

2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter. (2)

Inactive • 2020-21 (T-1), 2019-20 (T-1)
Dogsthorpe Landfill Site, Welland Road, Peterborough, Cambridgeshire, PE1 4TE (3 components)

2 gas reciprocating engines with a combined export output of approximately 2MW. The generating equipment is connected to the distribution network via an import/export meter.

Inactive • 2020-21 (T-4), 2020-21 (T-1) ...
3.46 MW
Drakelow Power Station, Burton-on-Trent, DE15 9NG (2 components)

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines UK Dynamic Reserve Limited New Build Generating CMU Conditional DE15
Inactive • 2022-23 (T-4)
36.15 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components)

The CMU is a new reciprocating engine based gas fuelled generating unit.

Reciprocating engines OCGT and Reciprocating Engines Sainc Energy Limited New Build Generating CMU DPG-GAS DPG-GAS Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
37.23 MW
Dunsteads Farm, Trueloves Lane, Ingatestone, CM4 0NH (1 component)

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Reciprocating engines Edge Power (Larkfield Farm) Limited New Build Generating CMU 2018 20MW TWO Rejected CM4
Inactive • 2022-23 (T-4)
19.03 MW