Reciprocating engines

691 unique locations (1851 components) - Page 7 of 28

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Dunnikier Peaking Power, Wheatfield Road, Kirkcaldy. Fife. KY1 3PE (2 components) Geocoding Needed

The CMU is a new reciprocating engine based gas fuelled generating unit.

Reciprocating engines OCGT and Reciprocating Engines Sainc Energy Limited New Build Generating CMU DPG-GAS DPG-GAS Rejected KY1
Inactive • 2022-23 (T-4), 2021-22 (T-4)
37.23 MW
Dunsteads Farm, Trueloves Lane, Ingatestone, CM4 0NH (1 component) Geocoding Needed

20MW gas fuelled plant using new containerised engines with associated switchgear, substation and gas metering kiosk, and connections to the electricity and gas grid. The total planned capital expenditure for …

Reciprocating engines Edge Power (Larkfield Farm) Limited New Build Generating CMU 2018 20MW TWO Rejected CM4
Inactive • 2022-23 (T-4)
19.03 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (1 component)

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Reciprocating engines BALANCE POWER LIMITED Existing Generating CMU Ipswich Docks A IP3
Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA, (Please refer to "Balance Power Limited - PPG Supporting Letter" for further clarity) (1 component) Geocoding Needed

A 20 MW CMU, operating on a dockside, metered at the distribution boundary and having no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component)

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Reciprocating engines EQUIVALENCE ENERGY LIMITED Existing Generating CMU Ipswich 2 IP3
Inactive • 2019-20 (T-1)
EDF Land, Cliff Quay, Ipswich Docks, Suffolk, IP3 0NA, (Please refer to "Equivalence Energy Limited - PPG Supporting Letter" for further clarity on the CMU address) (1 component) Geocoding Needed

Renewable green diesel fuelled generators, connected to the distrbution network at 132KV, metered using a standard half-hour (COP2) meter at the distrbution network boundary with no auxilliary load on site.

Inactive • 2019-20 (T-1)
19.03 MW
Edge Lane Street, Royton, Oldham, OL2 6DS (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
4.76 MW
Elevator Road, Trafford Park M17 1BR (3 components) Geocoding Needed
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elavator Road
• 20MW of installed capacity of gas fuelled reciprocating engines to be installed on designated land within a manufacturing compound on Elevator Road
Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Elavator Elavator M17
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
38.02 MW
Ely Road, Waterbeach, Cambridge, Cambridgeshire, CB25 9PG (2 components) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2023-24 (T-4), 2022-23 (T-3)
9.72 MW
Enterprise Drive, Four Ashes, Wolverhampton WV10 7DF (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU FOUR ASHES Conditional WV10
Inactive • 2022-23 (T-4)
4.76 MW
ENTERPRISE POWER 11 - 12 ENTERPRISE WAY WESTWOOD INDUSTRIAL ESTATE MARGATE CT9 4JA (3 components)

CMU consisting of multiple gas reciprocating engines and alternators (3)

Reciprocating engines URBAN RESERVE (ASSETCO) LIMITED New Build Generating CMU Enterprise Power Enterprise Power CT9
Inactive • 2023-24 (T-1), 2022-23 (T-1) ...
4.76 MW
E.r.f Way, Middlewich CW10 0QJ (3 components) Geocoding Needed

Gas fired reciprocating engines

Reciprocating engines CONRAD (MIDDLEWICH) LIMITED New Build Generating CMU ERF Way ERF Way CW10
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
39.41 MW
Exeter Road, Ottery St. Mary, EX11 1RB (1 component) Geocoding Needed

A new build gas fuelled power generating unit comprising multiple reciprocating engines.

Reciprocating engines SWB Power Ltd New Build Generating CMU OTTERY ST. MARY Conditional EX11
Inactive • 2022-23 (T-4)
4.76 MW
Factory Lane, Croydon, Surrey, CR0 3LE (4 components) Geocoding Needed

The auxiliary load is minimal (1MW) and have been removed from the metering assessment when calculating the maximum generating output

Reciprocating engines OCGT and Reciprocating Engines WHITETOWER ENERGY LIMITED Existing Generating CMU Croydon Energy Croydon Energy +1 more CR0
Inactive • 2022-23 (T-4), 2021-22 (T-4) ...
189.45 MW
Faraday Rd, Plymouth, PL4 0ST (4 components) Geocoding Needed
• Gas fired reciprocating engines.
• New build CMU employing gas fired reciprocating engines. The Financial Commitment Milestone has been achieved for a previous auction. The site will generate at unity and therefore a power factor of 1.0 has been used to convert MVA to MW.
Reciprocating engines Viridis 178 Limited New Build Generating CMU DG002 DG002 +1 more Conditional PL4
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
71.15 MW
Five Oaks Grid Substation Horsham Road Five Oaks Billinghurst, RH14 9AT (4 components)

4 x reciprocating engines (3)

Reciprocating engines SSEPG (OPERATIONS) LIMITED Existing Generating CMU Five Oaks Five Oaks +1 more RH14
Inactive • 2022-23 (T-1), 2021-22 (T-1) ...
Florence Energy Park, Cocknage Road, Stoke on Trent Staffordshire ST3 4AE (1 component)

Gas reciprocating engines

Reciprocating engines ALKANE ENERGY UK LIMITED Existing Generating CMU CMM Port ST3
Inactive • 2019-20 (T-1)
Florence Energy Park, Cocknage Road, Stoke on Trent, Staffordshire, ST3 4AE (4 components) Geocoding Needed
• Gas fired reciprocating engines
• Gas reciprocating engines
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
15.92 MW
Fordbridge Lane, Alfreton, DE55 5JY (2 components) Geocoding Needed

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU Blackwell Not Prequalified DE55
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Former Fylde Coast Ice Arena Bristol Avenue FY2 0JF (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CONRAD (BISPHAM) LIMITED New Build Generating CMU Bispham Conditional FY2
Inactive • 2019-20 (T-1)
Former Fylde Coast Ice Arena, Bristol Avenue, FY2 0JF (4 components) Geocoding Needed
• Energy facility comprising of reciprocating engine sets.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.
Reciprocating engines CONRAD (BISPHAM) LIMITED New Build Generating CMU Bog FY2
Inactive • 2022-23 (T-4), 2020-21 (T-4) ...
42.62 MW
Former site of building 23, QinetiQ Portsdown Technology Park, Southwick Rd, Portsmouth PO6 3RU (1 component) Geocoding Needed

20 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Portsdown Power Limited New Build Generating CMU Portsdown Power Conditional PO6
Inactive • 2022-23 (T-4)
18.84 MW
Former Soreen Factory, Taylor Road, Trafford Park, M41 7WS (1 component) Geocoding Needed

Gas fired generating units

Inactive • 2022-23 (T-4)
3.62 MW
Forth Drove, Peterborough PE1 5NT (3 components) Geocoding Needed

A Prospective New Build Gas reciprocating energy reserve facility

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) RIVER NENE POWER LIMITED New Build Generating CMU Peterborough DG Peterborough DG +1 more PE1
Inactive • 2020-21 (T-4), 2019-20 (T-1) ...
136.85 MW
Foul Lane, Southport, PR8 5LA (1 component) Geocoding Needed

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional PR8
Inactive • 2022-23 (T-4)
19.75 MW
Loading map...
Showing 25 locations