Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Reciprocating engines

1208 unique locations (4420 components) - Page 8 of 49

Active MW: 45623.98 MW
Inactive MW: 10846.14 MW
Caledon Green, Earls Gate Park, Grangemouth, FK3 8TR (3 components) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines CALEDON GREEN GENERATION LIMITED New Build Generating CMU Caledon Green Generation Limited Caledon Green Generation Limited FK3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
37.93 MW
Campbeltown Road, Tranmere, CH41 9HP (3 components) Geocoding Needed

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Inactive • 2021-22 (T-4), 2019-20 (T-1) ...
37.99 MW
Canal St, Brierley Hill DY5 1JJ, UK (2 components) Geocoding Needed

14 x 1.1MW gas reciprocating engines at Canal St, Brierley Hill, Dudley on a designated in an industrial / Commercial district.

Reciprocating engines AGGREKO DISTRIBUTED ENERGY HOLDINGS LIMITED New Build Generating CMU CMU_AgBH01 Conditional DY5
Inactive • 2022-23 (T-4), 2019-20 (T-1)
14.23 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset. TA3 6RX (4 components) Geocoding Needed

The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.

Reciprocating engines OCGT and Reciprocating Engines (Fuel Type - Gas) UK POWER RESERVE LIMITED Existing Generating CMU Cantelo Power Station Cantelo Power Station +2 more TA3
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
18.43 MW
Cantelo Reception, UK Power Reserve Ltd, Bradon Farm, Isle Abbots, Taunton, Somerset., TA3 6RX (10 components) Geocoding Needed
• The CMU will be formed of multiple individual gas generating units controlled centrally and exporting to the distribution system.
• The CMU will be formed of multiple individual generating units controlled centrally and exporting to the distribution system.
Active • 2027-28 (T-4), 2026-27 (T-4) ...
60.76 MW
Cards Road, Sandon CM2 7AE (1 component) Geocoding Needed

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD ENERGY (DEVELOPMENTS) LIMITED New Build Generating CMU Sandon Not Prequalified CM2
Active • 2024-25 (T-4)
7.62 MW
Carrington Power Station, 132 Manchester Road, Carrington, Manchester, M31 4AY, United Kingdom (28 components) Geocoding Needed
• The CMU component is a combined cycle gas turbine
• This CMU (CARRI3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
• This CMU (CGTN_3) will be formed of multiple gas reciprocating units controlled centrally & exporting to the Distribution system.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
7531.31 MW
Cascade Works, Wellington Rd, Burton-on-Trent, DE14 2DW (9 components) Geocoding Needed
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
• Reciprocating gensets in acoustic enclosure
Reciprocating engines FRP MERCIA HOLDCO 2 LIMITED New Build Generating CMU Holditch Wellington Rd +1 more DE14
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
23.10 MW
Castle Hill Road, Bransholme, Sutton, Kingston Upon Hull, HU7 4TX (1 component) Geocoding Needed

A new build, gas fuelled generation station.

Reciprocating engines BLACK SHED GENERATION LIMITED New Build Generating CMU Bransholme Not Prequalified HU7
Active • 2024-25 (T-4)
19.71 MW
Cavendish Rd Stevenage SG1 2ET UK (4 components)

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW. (3)

Inactive • 2021-22 (T-1), 2020-21 (T-1) ...
Cavendish Rd, Stevenage, SG1 2ET, UK (13 components) Geocoding Needed

Containerised High Speed Gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 8MW.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
45.45 MW
Cavendish Road 33kV Generation, Land Behind Caswell House, Cavendish Road, Stevenage, SG1 2ET (11 components) Geocoding Needed
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear with a total connection capacity of 9MW.
• Containerised high speed gas-fired reciprocating engines with transformers, switchgear and associated control gear.
Reciprocating Engines Reciprocating engines CONRAD (STEVENAGE A) LIMITED Existing Generating CMU Caswell Caswell +1 more SG1
Active • 2028-29 (T-4), 2027-28 (T-4) ...
39.40 MW
Caxton Way, Dinnington, Rotherham, S25 3QE (5 components) Geocoding Needed
• A 10MW new build gas generating station..
• A 20MW new build gas generating station..
Reciprocating engines WALKER & SON (HAULIERS) LIMITED New Build Generating CMU DINNINGTON1 DINNINGTON2 +1 more S25
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
38.04 MW
Centurion Way, Farington, Leyland, PR25 3UQ (1 component) Geocoding Needed

Gas fired reciprocating engines.

Reciprocating engines Dockside Power Limited New Build Generating CMU Conditional PR25
Inactive • 2022-23 (T-4)
19.03 MW
Challenge Way, Blackburn, Lancashire BB1 5QB (4 components) Geocoding Needed

Energy facility comprising of reciprocating engine sets and ancillary equipment.

Reciprocating engines STOR 148 LTD New Build Generating CMU Whitebirk Whitebirk +1 more Conditional BB1
Active • 2024-25 (T-4), 2023-24 (T-4) ...
57.07 MW
Chamberhall Street, Bury, Lancashire, BL9 0LU (7 components) Geocoding Needed
• 20 MW power plant comprising 10 x 2MW gas reciprocating engines. Power plant will be connected to the local distribution network and local gas network.
• 20MW power plant comprising of reciprocating engines. The power plant is connected to the local distribution network and local gas network.
Reciprocating engines BURY POWER LIMITED Existing Generating CMU Bury Power Bury Power Limited +3 more BL9
Active • 2028-29 (T-4), 2027-28 (T-4) ...
111.21 MW
Chatterley Whitfield Enterprise Centre Stoke-on-Trent ST6 8UW (1 component)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (CHATTERLEY) LIMITED New Build Generating CMU CHATTERLEY ST6
Inactive • 2019-20 (T-1)
Chatterley Whitfield Enterprise Centre, Stoke-on-Trent, ST6 8UW (2 components) Geocoding Needed
• A new build diesel or gas fuelled generating station.
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2020-21 (T-4), 2019-20 (T-1)
37.86 MW
Chemistry Lane, Pentre, Deeside, CH5 2DW (3 components) Geocoding Needed

14MW Power plant comprising 7x2MW gas reciprocating engines. The power plant is connected to the local distribution and gas network.

Reciprocating engines CULVERY POWER LIMITED Existing Generating CMU Culvery Power CH5
Inactive • 2023-24 (T-4), 2022-23 (T-3) ...
13.11 MW
Cheshire Power Station (Formally known as 'Bridgewater Paper') North Road Ellesmere Port CH65 1AF (2 components)
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cheshire Power Station, (Formally known as 'Bridgewater Paper'), North Road, Ellesmere Port, CH65 1AF (2 components) Geocoding Needed
• 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
• New build 12 x 1.1 MW Reciprocating gas engines at Cheshire Power Station
Inactive • 2019-20 (T-1), 2018-19 (T-1)
24.62 MW
Cheshire Power Station (Formerly known as 'Bridgewater Paper') North Road Ellesmere Port South Wirral CH65 1AF (2 components)

6 x 1.1MW gas reciprocating engines at Cheshire Power Station (2)

Inactive • 2019-20 (T-1), 2018-19 (T-1)
Cheshire Power Station North Road Ellesmere Port Cheshire CH65 1AF (1 component)

CMU will be formed of multiple individual reciprocating gas engines.

Reciprocating engines RWE GENERATION UK PLC New Build Generating CMU CMU_CHEN21 CH65
Inactive • 2023-24 (T-1)
19.04 MW
Cheshire Power Station, North Road, Ellesmere Port, Cheshire, CH65 1AF (7 components) Geocoding Needed
• CMU formed of multiple individual Reciprocating Engines
• CMU will be formed of multiple individual gas reciprocating gas engines.
• CMU will be formed of multiple individual reciprocating gas engines.
Reciprocating engines RWE GENERATION UK PLC Existing Generating CMU CMU_CHEN21 CH65
Active • 2025-26 (T-4), 2024-25 (T-4) ...
114.04 MW
Loading map...
Showing 25 locations