Chesterfield Road, Swallownest, Sheffield. S26 4XA (3 components)
• 10 x 1mw gas generator units to be installed on designated Chesterfield Road- Connection offer is for 20mw which is split between CMUs - further detail in covering letter
• 5 x 1mw gas generator units to be installed on designated Chesterfield Road- Connection offer is for 20mw which is split between CMUs - further detail in covering letter
Reciprocating engines ARL 011 Limited New Build Generating CMU Conditional S26
Inactive • 2022-23 (T-4)
19.03 MW
Chickenhall Lane, Eastleigh, SO50 6RQ (3 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Reciprocating engines CONRAD (BISHOPSTOKE) LIMITED New Build Generating CMU Bishopstoke Bishopstoke +1 more SO50
Active • 2025-26 (T-4), 2024-25 (T-1) ...
20.52 MW
Chicks Lane, Chewton Mendip, BA3 4BY (1 component)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED New Build Generating CMU Chewton Not Prequalified BA3
Active • 2024-25 (T-4)
4.38 MW
Chippenham Station, Cocklebury Lane, Chippenham, SN15 1RS (8 components)

4 x reciprocating engines

Active • 2025-26 (T-4), 2024-25 (T-4) ...
47.80 MW
Church Field Road, Sudbury, CO10 2YA (3 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines

Reciprocating engines BIOGAS TECHNOLOGY LIMITED GREAT DUNMOW POWER LIMITED New Build Generating CMU Sudbury Sudbury A +1 more Not Prequalified CO10
Active • 2025-26 (T-4), 2024-25 (T-4)
20.30 MW
Church Fields Road, Sudbury, CO10 2YA (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU SUDBURY PRIMARY Not Prequalified CO10
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.18 MW
Clarke Avenue Porte Marsh Industrial Estate Calne SN11 9BS (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (CALNE) LIMITED New Build Generating CMU Calne Calne +1 more SN11
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Clarke Avenue, Porte Marsh Industrial Estate, Calne, SN11 9BS (7 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.11 MW
Claverhouse Industrial Estate, Dundee, DD4 9QH (4 components)

A new build, gas fuelled generation station.

Reciprocating engines CLAVERHOUSE GENERATION LIMITED New Build Generating CMU Claverhouse Generation Limited Claverhouse Generation Limited +1 more DD4
Active • 2024-25 (T-4), 2023-24 (T-4) ...
56.88 MW
CLAYDON BUSINESS PARK, GIPPING ROAD, GREAT BLAKENHAM, IPSWICH, IP6 0NL (1 component)

CMU consisting of a gas reciprocating engine and alternator

Active • 2024-25 (T-4)
2.41 MW
Clay Pit Hill Peak Lopping Gas Station, Dormington, HR1 4EE (2 components)

New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant

Inactive • 2022-23 (T-4)
23.79 MW
Clay Tye Rd, Cranham, London Borough of Havering, RM14 3PL, United Kingdom (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley20 Not Prequalified RM14
Active • 2024-25 (T-4)
46.18 MW
Clay Tye Road, Upminster, RM14 3PL (2 components)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley Not Prequalified RM14
Inactive • 2023-24 (T-4), 2022-23 (T-3)
47.02 MW
Clay Tye Road, Upminster, RM14 3PL, UK (1 component)

The proposed power plant would consist of a number new highly efficient gas fired generating units plus ancillary equipment. Each genset is based on advanced reciprocating engine technology.

Reciprocating engines CSE19 Limited New Build Generating CMU Warley Conditional RM14
Inactive • 2022-23 (T-4)
46.14 MW
Clay Wheels Lane, Sheffield, S6 1LZ (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU CLAY WHEELS Not Prequalified S6
Inactive • 2023-24 (T-4), 2022-23 (T-3)
5.22 MW
Cliftonhall Road, Newbridge, Edinburgh, EH28 8PW (1 component)

Multiple gas engine generators with an output to the distribution network of 10.5MW. To be installed on land at Newbridge in Edinburgh.

Inactive • 2022-23 (T-4)
9.99 MW
Clifton Street, Miles Platting, M40 8HF (2 components)

A gas fuelled electrical power generating unit comprising multiple reciprocating engines.

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU STUART STREET Not Prequalified M40
Inactive • 2023-24 (T-4), 2022-23 (T-3)
7.60 MW
Club Farm, Pimlico Link Road, Clitheroe BB7 1QW (1 component)

A new build gas fuelled power generating unit comprising multiple reciprocating engines

Reciprocating engines BALANCE POWER PROJECTS LIMITED New Build Generating CMU CLUB FARM Conditional BB7
Inactive • 2022-23 (T-4)
19.03 MW
Cody Technology Park, Old Ively Road, Farnborough, Hampshire, GU14 0LX (1 component)

16 MW power plant comprising reciprocating engines. The power plant will be connected to the local distribution network and local gas network.

Reciprocating engines Farnborough Power Limited New Build Generating CMU Farnborough Power Limited Conditional GU14
Inactive • 2022-23 (T-4)
15.03 MW
Coldhurst Street, Oldham, OL1 2BQ (2 components)

A gas fuelled generating station.

Reciprocating engines AVE 007 Limited New Build Generating CMU Coldhurst Street Not Prequalified OL1
Inactive • 2023-24 (T-4), 2022-23 (T-3)
4.75 MW
Collyland Road, Fishcross, FK10 3JN (2 components)

A new build, gas fuelled generation station.

Reciprocating engines FISHCROSS GENERATION LIMITED New Build Generating CMU Fishcross Fishcross Not Prequalified FK10
Active • 2025-26 (T-4), 2024-25 (T-4)
42.91 MW
Commerce Way Flitwick MK45 5BP (3 components)
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant (2)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Reciprocating engines CONRAD (AMPTHILL) LIMITED New Build Generating CMU Ampthill Ampthill +1 more MK45
Inactive • 2022-23 (T-1), 2020-21 (T-1) ...
Commerce Way, Flitwick, MK45 5BP (7 components)
• Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
• New Build Generating CMU comprising of gas fuelled reciprocating engines and gas delivery plant
Inactive • 2023-24 (T-4), 2022-23 (T-4) ...
17.14 MW
Commercial Road, Bromborough, Birkenhead, Wirral CH62 3NL (1 component)

The CMU component consist of gas fired reciprocating engines to be installed on designated land at Commercial Road, Bromborough Birkenhead, Wirral.

Reciprocating engines RELIANCE ENERGY LIMITED New Build Generating CMU Not Prequalified CH62
Active • 2024-25 (T-4)