Storage (Duration 1h)

3 unique locations (5 components)

Active MW: 20052.96 MW
Inactive MW: 1148.27 MW
SNARLTON LANE, SNARLTON LANE, MELKSHAM, SN12 7QP (1 component)

1 hour Lithium-ion battery storage facility in Melksham, Wiltshire going to be connected to Sandridge 132/33 kV substation with a connection capacity of 49.9MW

Active • 2025-26 (T-1)
5.98 MW
Snarlton Farm Battery, Snarlton Lane, Melksham, SN12 7QP (2 components)
• 30.000MW standalone battery energy storage project
• 47.000MW standalone battery energy storage project
Active • 2026-27 (T-4), 2024-25 (T-1)
8.87 MW
8.87 MW