Storage (Duration 2h)

26 unique locations (435 components) - Page 1 of 2

Wellington Street, Oldham, Lancashire OL4 1SA (8 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2024-25 (T-4) ...
18.20 MW
Welkin Road, Bredbury, SK6 2BH (7 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.50 MW
The Manorway, Stanford-le-Hope, Essex SS17 9LP (11 components)
• A new battery storage system comprising batteries, containers, inverters, control systems and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
• A new open cycle power station comprising gas turbine(s) and associated balance of plant. This will be constructed on brownfield land in Stanford-Le-Hope, Essex. Metering of output is Net of auxillary load.
Active • 2026-27 (T-4), 2025-26 (T-4) ...
30.72 MW
Swindon Power Generation Plant, Unit 1, Kingsdown Lane, Swindon, Wiltshire, SN3 4FS (6 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2027-28 (T-4), 2025-26 (T-1) ...
8.73 MW
Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH (13 components)

Lithium Ion battery storage system capable of charging, storing and discharging electricity. Land at Stevensons Farm, Arterial Road, Nevendon, Essex SS14 3JH.

Active • 2025-26 (T-4), 2024-25 (T-1) ...
Sembcorp UK Headquarters Wilton International Middlesbrough TS90 8WS United Kingdom (14 components)
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S17G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S19GT2 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• CMU Metering is embedded behind Grid Connection Site: Wilton 66kV Substation. BM Unit T_WILCT-1). S20G02 is a OCGT in CHP Configuration within the (former ICI) Wilton Site.
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
116.40 MW
Rosper Road Immingham North Lincolnshire DN40 3DZ (16 components)
• Battery storage unit
• Gas CHP on South bank of river Humber providing electricity and industrial steam
• New build gas reciprocating multi-engine generating plant
Active • 2028-29 (T-4), 2027-28 (T-4) ...
3439.50 MW
Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (9 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
22.21 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (13 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
48.30 MW
Little Raith Farm, Auchtertool, Fife, KY5 0AX (10 components)
• 48MW Battery Energy Storage facility
• 49.5MW Battery Energy Storage facility
• Battery Energy Storage facility
Active • 2025-26 (T-4), 2024-25 (T-4) ...
54.98 MW
Land to West of Welkin mill, Welkin Rd, Lower Bredbury, Stockport, SK6 2BH (9 components)
• A 10MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 15MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• A 20MW New Build Battery Storage site comprising the aggregated capacity of mobile battery units present on the site for the delivery of the CMU capacity
• ... and 2 more unique descriptions
Active • 2025-26 (T-4), 2024-25 (T-4) ...
12.96 MW
Land at Fulwood Rd North, Sutton-in-Ashfield, NG17 2NB (25 components)
• Battery storage unit
• New reciprocating gensets in acoustic enclosure
• Reciprocating genset in acoustic enclosure
• ... and 1 more unique description
Active • 2025-26 (T-4), 2023-24 (T-4) ...
Land at Coopers Lane, Knowsley, Liverpool L33 7TT (5 components)
• A New Build Gas fuelled power plant at Kirkby substation.
• A New Build Transmission Connected Battery Energy Storage System.
Active • 2028-29 (T-4), 2027-28 (T-4) ...
32.48 MW
Land at Capenhurst Sub Station, Capenhurst, Cheshire, CH66 2HJ (6 components)
• A New Build Battery Energy Storage System
• A New Build Gas fuelled power plant at Capenhurst substation
Active • 2025-26 (T-4), 2024-25 (T-4) ...
Land at Bumpers Farm, Ilmer, Buckinghamshire, HP27 9RE (16 components)
• A new build 48MW battery energy storage system
• A new build 49.5MW battery energy storage system
• A new build battery energy storage system
Active • 2026-27 (T-4), 2025-26 (T-4) ...
90.89 MW
HOWICK HALL FARM HOWICK CROSS LANE, PENWORTHAM, PRESTON, PR1 0NS (16 components)
• Battery Storage Plant
• Gas peaking reciprocating engines
Active • 2025-26 (T-4), 2024-25 (T-4) ...
25.67 MW
Eggborough Power Station, Goole, East Yorkshire, DN14 0BS (61 components)
• New build Open Cycle Gas Turbine unit 5 at Eggborough Power Station (2)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 3)
• Battery Energy Storage System built on land at the former Eggborough Power Station (Unit 4)
• ... and 1 more unique description
Active • 2028-29 (T-4), 2027-28 (T-4) ...
4657.99 MW
Dinorwig Power Station, Llanberis, Caernarfon, LL55 4TY (92 components)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage)
• BM unit T_DINO-1 at Dinorwig Power Station (Pumped Storage).
• BM unit T_DINO-2 at Dinorwig Power Station (Pumped Storage)
• ... and 2 more unique descriptions
Active • 2028-29 (T-4), 2027-28 (T-4) ...
1613.68 MW
135 CLYDESDALE PLACE MOSS SIDE INDUSTRIAL ESTATE LEYLAND PR26 7QS (5 components)
• CMU consisting of multiple reciprocating engines and alternators (2)
• CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid
Active • 2024-25 (T-4), 2023-24 (T-4) ...
16.91 MW
Loading map...
Showing 25 locations