Storage (Duration 2h)

3 unique locations (9 components)

Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.75 MW
Land north west of Bredbury Substation Welkin Road Bredbury, Stockport SK6 2BS (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2027-28 (T-4), 2025-26 (T-1)
32.18 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (3 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4), 2025-26 (T-1)
32.03 MW
Loading map...
Showing 3 locations