Home Grok GrokAsk Grok (Beta) Technologies Companies Locations Map Explorer FAQ Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

18 unique locations (42 components)

Active MW: 66252.80 MW
Inactive MW: 150.27 MW
West of Sellindge Substation, Church Lane, Sellindge, Aldington, Ashford TN25 6AF (1 component)
Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Sellindge Not Prequalified TN25
Active • 2026-27 (T-4)
8.03 MW
West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)
Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Landulph Not Prequalified PL12
Active • 2026-27 (T-4)
8.98 MW
SOUTH OF NATIONAL GRID IVER SUBSTATION, SLOUGH ROAD, IVER HEATH UB8 2FX (1 component)
Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Iver Not Prequalified UB8
Active • 2026-27 (T-4)
7.56 MW
Land south east of Sundon Substation, Water End Lane, Chalton, Luton, LU4 9UB (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) PIVOTED POWER LLP Pivot Power Sundon Pivot Power Sundon +2 more LU4
Active • 2026-27 (T-4), 2025-26 (T-1) ...
31.34 MW
Land south east of Sundon Substation Water End Lane Chalton, Luton LU4 9UB (4 components)
Storage (Duration 2h) PIVOTED POWER LLP Existing Generating CMU Pivot Power Sundon Pivot Power Sundon LU4
Active • 2026-27 (T-4), 2025-26 (T-4) ...
31.34 MW
Land north west of Bredbury Substation, Welkin Road, Bredbury, Stockport, SK6 2BS (4 components)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation. (3)

Storage (Duration 2h) Storage (Duration 9h) PIVOTED POWER LLP Pivot Power Bredbury Pivot Power Bredbury +2 more SK6
Active • 2027-28 (T-4), 2026-27 (T-4) ...
27.15 MW
39.48 MW
47.33 MW
Land north of Indian Queens Substation, Domellick Hill (B3279), St Dennis, St Austell, Cornwall, PL26 8BY (2 components)
Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Indian Queens Pivot Power Indian Queens PL26
Active • 2026-27 (T-4), 2025-26 (T-1)
19.56 MW
Land north east of Bustleholm Substation, Painswick Close, Walsall, WS5 4SJ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Land north east of Bustleholm Substation, M6, Walsall, WS5 4SJ (1 component)
Storage (Duration 2h) PIVOTED POWER LLP New Build Generating CMU Pivot Power Bustleholm WS5
Inactive • 2023-24 (T-1)
16.66 MW
Land directly South to Coventry Substation, Parrotts Grove, Coventry, CV2 1NQ (1 component)

The CMU is a electro-chemical Lithium-ion battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2024-25 (T-4)
Loading map...
Showing 18 locations