Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

Storage (Duration 2h)

78 unique locations (540 components) - Page 1 of 4

West of Landulph Substation, Ellbridge Lane Hatt, Saltash, PL12 6NE (1 component)

The CMU is a electro-chemical battery storage system connected to the transmission system at the National Grid Transmission Substation.

Active • 2026-27 (T-4)
8.98 MW
Wellington Street, Oldham, Lancashire OL4 1SA (6 components)
• Energy facility comprising of battery energy storage sets and ancillary equipment.
• Energy facility comprising of reciprocating engine sets and ancillary equipment.
Active • 2026-27 (T-4), 2023-24 (T-1) ...
29.30 MW
Welkin Road, Bredbury, SK6 2BH (4 components)
• A gas fuelled generating station.
• Battery Energy Storage System
Active • 2026-27 (T-4), 2025-26 (T-1) ...
7.79 MW
Tees Dock Road Redcar and Cleveland Tees Valley England TS6 7AB (1 component)

A new build 100MW/200MWh battery storage facility connected to the Transmission network, located in Teesworks, Redcar

Active • 2026-27 (T-4)
23.04 MW
STOR Facility Waterswallows Road Green Fairfield Buxton Derbyshire SK17 7JP (1 component)

Battery energy storage facility with a 2 hour duration and a maximum capacity of 14 MW, located in Buxton.

Active • 2026-27 (T-4)
2.20 MW
Steam Lane, Avonmouth industrial Estate, Bristol, BS11 0YT (4 components)

20 x 1.1MWh battery modules connected to provide 10MW max instantaneous output and 20MWh energy output per day. All batteries are class [XX].

Active • 2026-27 (T-4), 2023-24 (T-1)
13.44 MW
South West side of the A444, Castle Gresley, DE11 9ES (2 components)

Battery energy storage system, together with associated equipment, infrastructure and ancillary works.

Active • 2026-27 (T-4)
6.27 MW
Southmoor Lane, Havant, Hampshire, PO9 1JW (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW
South Fambridge Hall Solar Farm Fambridge Road, South Fambridge, Rochford, SS4 3LS (1 component)

20MW/40MWh of Lithium Iron Battery Electric Storage System, comprising 6 storage containers, and associated metering, switchgear and electrical infrastructure. the Battery will be its own BMU and will be co-located …

Active • 2026-27 (T-4)
4.61 MW
Smithyard Lane, Williton, TA4 4NN (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2023-24 (T-1)
19.29 MW
Slack Lane, Westhoughton, BL5 3LB (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
2.13 MW
Sergeantlaw Farm, Sergeantlaw Road, Paisley, Renfrewshire, PA2 8UY (8 components)
• 50MW of BESS to be installed within a future Greener Grid Park.
• BESS project to be installed within a future Greener Grid Park.
Active • 2028-29 (T-4), 2026-27 (T-4) ...
58.42 MW
RWE Generation UK plc, Cheshire Power Station North Road, Ellesmere Port Cheshire CH65 1AF (2 components)

The CMU will be formed of multiple battery storage units and medium voltage stations (inverter and battery transformer) connected in parallel.

Active • 2026-27 (T-4), 2025-26 (T-4)
21.42 MW
Pyworthy, Torridge District, Devon, EX22 6LQ (1 component)

50 x 1.1MWh battery modules connected to provide 25MW max instantaneous output and 50MWh energy output per day. All batteries are class [XX]. Batteries are class 1.

Active • 2026-27 (T-4)
5.90 MW
Plot E, XL Business Park, Corner Statham Road and Spa Lane, Skelmersdale, Lancashire, United Kingdom, L40 6JQ (15 components)
• A New Build battery energy storage system.
• An existing battery energy storage system.
• The New Build CMU, will consist of the design, procurement of new Apparatus, build and operation of a battery energy storage system, consisting of power conversion units(inverters), battery cells, transformer, cabling and other equipment as necessary for the operation of an energy storage system. It will be connected to the distribution network.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
71.09 MW
Plot C, Land at Severn Road Avonmouth BS10 7SE (4 components)

Grid-scale energy storage system based on Lithium Ion, capable of exporting the declared capacity for a duration of 2 hours

Active • 2027-28 (T-4), 2026-27 (T-4)
52.81 MW
Philip Street Car Breakers, Philip Street, St Philips Marsh, Bristol, BS2 0TA (5 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2023-24 (T-1)
9.02 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (9 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
21.03 MW
Off Letch Lane, Stockton-on-Tees, TS21 1ED (1 component)

New Build CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.45 MW
Northmead Lane, Iron Acton, Rangeworthy, BS37 7LT (2 components)

New build two-hour duration battery storage

Active • 2026-27 (T-4)
4.16 MW
35.45 MW
New Road, Featherstone, Wolverhampton, WV10 7NS (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
9.93 MW
Netherton Farm, Keith AB55 5PE (3 components)
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's
• 200MW battery storage located near to the National Grid Blackhillock substation, split into two BMU's.
Active • 2026-27 (T-4), 2025-26 (T-1)
54.30 MW
Monk Fryston BESS Phase 1, Rawfield Lane, Burton Salmon, Lumby, Selby, North Yorkshire, United Kingdom, LS25 5JB (3 components)

The CMU is a Battery Energy Storage System with a planned 320MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4)
183.24 MW
Loading map...
Showing 25 locations