Ray Wind Farm, Kirkwhelpington, Newcastle upon Tyne, Northumberland (9 components)
• A new build 10MW battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
• A new build 20 MW / 2 hour battery storage facility. The construction of this new build generating CMU comprises site preparation; ground works for concrete raft foundations and cable trenching; installation of three containerised battery units; six inverter banks; associated 33kV transformer; switchgear and HV station.
Active • 2024-25 (T-4), 2024-25 (T-1) ...
26.66 MW
Haddon Farm, Haddons Lane, Claveshay, North Petherton, Bridgwater, TA6 6PG (1 component)

New Build Generating CMU comprising of battery storage and associated plant.

Active • 2026-27 (T-4)
7.09 MW