Storage (Duration 2h)

17 unique locations (71 components)

Pillswood Phase 1, Pillswood Farm, Dunswell Farm, Cottingham, East Riding Of Yorkshire, HU16 4JS (5 components)
• A 49.9MW battery energy storage system
• A battery energy storage system
Active • 2024-25 (T-1), 2023-24 (T-1)
38.23 MW
Old Gloucester Road, Alveston, Bristol, UK, BS35 3TD (7 components)
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in NGED's South West region.
• This CMU is formed of a battery bank and PCS capable of providing 10MW of power with 23.9MWh of usable energy storage (2 hour duration). The system is connected via switch gear and a transformer to the 132kV network in WPD's South West region.
Active • 2026-27 (T-4), 2025-26 (T-1) ...
8.63 MW
27.97 MW
LAND WITHIN HUNSHELF COMPOUND, TOFT'S LANE, OXSPRING, BARNSLEY, S36 8WR (2 components)
• New Build 25 MW Battery Energy Storage system
• New Build Battery Energy Storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
7.52 MW
Land to the west of Pound Road, Axminster EX135UP (2 components)
• A 120.000 MW / 180.000 MWh battery energy storage system
• A 120.000 MW / 240.000 MWh battery energy storage system
Active • 2027-28 (T-4), 2026-27 (T-4)
42.18 MW
Land To East Of Balsillie Avenue And To The South Of The Limekilns, Glenrothes, Fife, KY6 3ET (3 components)

This is a 49.99MW battery storage facility connected at 33kV.

Active • 2026-27 (T-4), 2025-26 (T-1) ...
33.35 MW
Land off, Little Morton Farm, Little Morton, Retford, DN22 8BE (5 components)

Battery energy storage unit

Active • 2025-26 (T-4)
19.60 MW
Land off A130, Rettendon, Chelmsford, Essex, East of England, England, SS11 7RL, United Kingdom (3 components)

A Battery Energy Storage System

Active • 2027-28 (T-4), 2026-27 (T-4) ...
78.67 MW
Land north of Radstock Road, Midsomer Enterprise Park, Radstock Road, Midsomer Norton, Radstock, BA3 2AF (8 components)
• Existing CMU comprising of battery storage and associated plant
• New Build CMU comprising of battery storage and associated plant
Active • 2026-27 (T-4), 2025-26 (T-4) ...
4.42 MW
Land at Pond Farm, Pond Lane, Charlton, SN16 9DS (10 components)

A Battery Energy Storage System.

Active • 2028-29 (T-4), 2027-28 (T-4) ...
153.94 MW
Land at Keithick Estate, PH13 9LZ (2 components)

New Build CMU comprising of battery storage and associated plant

Active • 2026-27 (T-4), 2025-26 (T-4)
6.36 MW
LAND ADJOINING BATES ROAD QUAYSIDE INDUSTRIAL ESTATE MALDON CM9 5FA (1 component)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2024-25 (T-4)
2.46 MW
Hatfield Grid Station, Dellsome Lane, Colney Heath, St. Albans, AL4 0QT (2 components)

CMU consisting of multiple battery cells for electricity storage and the supply of electricity to the electricity grid

Active • 2026-27 (T-4), 2025-26 (T-4)
2.01 MW
Field At Grid Reference 504139 456454, Back Lane, Skerne, East Riding Of Yorkshire, YO25 8NQ (Address in planning application) Land Adjacent Driffield Supply Point, Wansford Road, Driffield (Address of grid connection) (2 components)
• CMU is a 28MW/56MWh Lithium-Ion Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 20kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 28 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 7 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/20kV step up transformer and a 630A 20 kV Ring Main Unit (RMU);
• CMU is a 32MW 32MWh Lithium Iron Battery Electric Storage System. The BESS is co-located with a solar PV system and shares a grid connection. The solar PV and the BESS will be separately metered, and registered as separate BMUs. The BESS will connect to the grid via the 20/66 kV substation of the Facility, connecting to additional panels on the 33 kV switchgear. The main assets, elements and systems forming the Electricity Storage Facility are: 16 containers with Lithium Ion battery modules (LFP), containers further including HVAC, fire extinguishing system and controls; 8 PCS skids, each comprising of 2x 2000 kVA converter, a 4 MVA 0.8/33 kV step up transformer and a 630A 33 kV Ring Main Unit (RMU);
Active • 2027-28 (T-4), 2026-27 (T-4)
6.32 MW
Fiddlers Ferry BESS, Widnes Rd, Warrington WA5 2UT (2 components)

The CMU is a Battery Energy Storage System with a planned 150MW active power output, consisting of containerised batteries.

Active • 2027-28 (T-4), 2026-27 (T-4)
50.45 MW
10.34 MW
Cleve Hill Solar Park, Seasalter Road, Graveney with Goodnestone, Swale, Kent CT5 4BP (3 components)
• A transmission connected battery storage unit
• A transmission connected solar park.
Active • 2024-25 (T-4)
44.19 MW
Loading map...
Showing 17 locations